Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 18, 2025
Site work for a water / sewer project in Pueblo, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000375860 Bid Intent Not Available LOCATION: The Project site is located at 2050 35th Ln, Pueblo, CO 81006 Pueblo County School District 70 has selected Wember as the Owner's Representative. The project is in the preconstruction phase and the goal is to bring on a General Contractor (GENERAL CONTRACTOR (LUMP SUM)) to provide cost estimating and constructability review throughout the design process. PROJECT DESCRIPTION The Pueblo County High School (PCHS) wastewater treatment facility (WWTF) requires an expansion to accommodate an increase in hydraulic and organic loading. Currently, the WWTF is made up of a 40,000-gallon primary/equalization tank, 10,000-gallon pre-anoxic tank, two Orenco Ax-Max units (one model Ax-Max250, one model Ax-Max200), a post-anoxic MBBR, and an Orenco polishing filter unit. Ultraviolet disinfection, alkalinity dosing, and carbon dosing occur in the existing controls building. The proposed upgrades to the WWTF will consist of removing, retaining, and adding components to the process. The new facility will employ the existing primary tank (converting all volume to primary treatment), a new 35,000-gallon equalization tank, the existing pre-anoxic tank, five Orenco Ax-Max units acting as stage 1 treatment (3 additional Ax-Max250s, 1 existing Ax-Max250, 1 additional AxMax200), one Orenco Ax-Max unit acting as stage 2 treatment (1 existing Ax-Max200), the existing MBBR, and the existing Orenco polishing filter. The ultraviolet disinfection system will be removed and replaced with chlorine disinfection. Alkalinity and carbon dosing will remain. A chlorine contact pipe loop will be installed prior to final discharge to the existing leach field to the east of the WWTF location. Renovations to the existing controls building will also be required, including but not limited to replacing the dry-wall in the building. Construction will occur primarily while the school is not in session during the summer months. It is critical that the majority of construction is completed by the start of the school year in late summer so there are no interruptions to typical school operations. The proposed timeline is as follows; see attached EXHIBIT A for more detail: Permitting Complete 03.25.2025 Construction 06.02.2025-08.09.2025 (Substantial Completion is Critical by beginning of Fall 2025 Semester) Question Deadline 02/20/2025 at 5:00 PM MT Questions are submitted online Yes, Deadline for receipt of questions and inquiries. Submit on Online.
Bid Results
Water / Sewer
$1,891,229.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2025
June 2, 2025
2050 35th Ln, Pueblo, CO
Related To This Project
Pueblo, CO
Bid Date: Feb 26 2025
Pueblo, CO
Bid Date: Feb 25 2025
Pueblo, CO
Bid Date: Feb 20 2025
Pueblo, CO
Bid Date: Mar 05 2025
Pueblo, CO
--
Pueblo, CO
Bid Date: Mar 05 2025
Pueblo, CO
Bid Date: Mar 06 2025
Pueblo, CO
Bid Date: Mar 14 2025
Pueblo, CO
Bid Date: Feb 18 2025
Pueblo, CO
Bid Date: Feb 19 2025
Pueblo, CO
Bid Date: Jul 09 2025
Pueblo, CO
Bid Date: Feb 05 2025
Pueblo, CO
Bid Date: Feb 05 2025
Pueblo, CO
Bid Date: Feb 05 2025
Pueblo, CO
Bid Date: Aug 01 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
