EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 20, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a medical facility in Sacramento, California. Completed plans call for the renovation of a medical facility.

Work: Construction includes the building of a Replacement Hospital Tower (RHT). The RHT is a key piece of UC Davis Healths strategy to achieve seismic safety compliance, additional service capacity, and operational improvements. The RHT project is envisioned to comprise a minimum of +/-332 inpatient beds including ICU and medical/surgical, Acuity Adaptable (ICU capable rooms), complex procedure rooms, and imaging and support services. The building option under consideration is approximately 909,000 BGSF of new space. The proposed site is located on the east end of the existing hospital, adjacent to the Pavilion that houses primarily surgery, ICUs, the burn unit, and the emergency department. The RHT will be connected to the Pavilion. Utilities for the RHT will be supplied from the Central Utilities Plant. All work in this bid package must comply with the UCDH RHT Project Labor Agreement (PLA). All work included in this bid package will be performed under the authority and jurisdiction of HCAi. The California Tower of the RHT project has an overall Elemental Target Value (todays dollars) of $950,000,000.00. The Bid Package Target Values are: 04-05 Masonry: $80,000 09-15 Ceramic Tile: $5,300,000 09-60 Paint Area A: $3,000,000 09-60 Paint Area B: $4,000,000 10-10 Signage: $3,600,000. Proposal Security in the amount of 15% of the Lump Sum Base Proposal, excluding alternates, shall accompany each bid. This bid package has been set aside for the Universitys Sheltered Bidding Program for SBE or DVBE status contractors only. SBE/DVBE firms must hold a certification from a recognized certifying agency. Firms must report their certification status on the Confirmation of Certification form included in the RFP documents. MBC reserves the right to reject any or all submittals and to withhold the award of this project for any reason it may determine.

Post-Bid

Medical

$15,908,000.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
82
Bidding Soon
1,536
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 12, 2025

img_map_placeholder

4800 2nd Ave, Sacramento, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replacement Hospital Tower (California Tower) - Bid Package RHT-29

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.