BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 23, 2025 at 8:00 PM

Updated April 24, 2025

Site work and paving for a mixed-use development in Brooklyn Park, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of April 23, 2025, the project was awarded to CS McCrossan Inc, with an awarded amount of $1,678,183.70.** Various residential streets, 4 park parking lots, and 1 north fire station: Mill and Overlay including concrete sidewalk, curb, and 2 driveway apron replacements Unless otherwise specifically indicated under the item description of the legal advertisement, all bids shall be subject to the following: No bids shall be withdrawn for a period of thirty-five (35) days after opening of bids. The City reserves the right to reject any or all bids and to waive informalities. A bid bond for five (5%) percent of the amount of the bid, (to be forfeited as liquidated damages in the event that the bid be accepted, and the bidder shall fail to enter promptly into a written contract and furnish the required bond) is required to submit online. Pursuant to the Brooklyn Park City Code, Chapter 42, this project is subject to prevailing wages as established by the Minnesota Department of Labor and Industry in Minn. Stat. 177.41 to 177.44, and corresponding Minnesota Rules 5200.1000 to 5200.1120. NOTICE OF BIDS WANTED BY THE CITY CLERK: Furnish and install the following estimated quantities: 162,200 SQ.YD Mill Bituminous Surface (2") at Various Residential Streets 3,550 SQ. YD. Mill Bituminous Surface (2") at 4-Park Parking Lots 2,400 SQ. YD. City removed old Bituminous, Replaced with (4") 2-lift at North Fire Station Lot 20,000 Tons Bituminous Mix Mn. DOT 2360-SPWEA240B 18,000 Gallons Bituminous Tack Oil 1,572 SF (6") Deep Concrete Sidewalk Replacement 488 LF Concrete Curb Replacement 46 SF Truncated Domes 1,310 SF (8") Deep 2-Driveway Aprons at North Fire Station The work to be done under their contract includes the furnishing of all labor, materials, transportation, tools, supplies, plant equipment, etc., necessary for the complete and satisfactory construction and installation of bituminous overlays on various streets, four neighborhood park parking lots and North Fire Station parking lot within the City of Brooklyn Park

Award

Roads / Highways

$1,678,184.00

Public - City

Paving, Site Work

3

7

2

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
135
Bidding Soon
1,583
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

May 1, 2025

Project location map

Multiple Locations, Brooklyn Park, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.