BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 13, 2025 at 8:00 PM

Updated June 14, 2025

Site work, paving and outdoor lighting for a mixed-use development in Brooklyn Park, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Excavation - Common 5,750 CU YD; Reinforcement Bars (Epoxy Coated) 20,560 POUND; Select Granular Embankment 4,758 CU YD; 14X10 Precast Concrete Box Culvert 78 LIN FT; Common Embankment 12,906 CU YD; Membrane Waterproofing System 1 LUMP SUM; Aggregate Base (CV) Class 5 1,630 CU YD; RC Pipe Sewer Class V 589 LIN FT; Bituminous Wearing Course Pavement 1,223 TON; Construct Drainage Structure 36 LIN FT; Bituminous Non-Wearing Course Pavement 954 TON; Lighting System 1 LUMP SUM; Type Curb Barrier Concrete 202 LIN FT; Traffic Control 1 LUMP SUM; Structural Excavation 1 LUMP SUM; Erosion control Supervisor 1 LUMP SUM; Structural Concrete 233 CU YD; Multi-Component 1,277 LIN FT; Reinforcement Bars 10,130 POUND; Multi-Component Ground In 3,150 LIN FT; together with numerous related items of work, all in accordance with Plans and Specifications. The Contractor must complete all Work to meet the requirements of 1516.2,“Project Acceptance,” under this Contract before June 1,2026 .

Award

Bridges / Tunnels

$1,610,338.00

Public - City

Outdoor Lighting, Paving, Site Work

139

12

24

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
172
Bidding Soon
1,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

June 17, 2025

Project location map

CSAH 103, Brooklyn Park, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.