BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a mixed-use development in Brooklyn Park, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Multimodal safety improvements at Brooklyn Boulevard (CSAH 152) and Welcome Avenue in the City of Brooklyn Park. Purpose & Description: The existing intersection of Brooklyn Boulevard (CSAH 152) at Welcome Avenue experiences a relatively high frequency of crashes compared to similar intersections throughout the county; many of which involve people walking. The intersection was last reconstructed in 1960 and was upgraded to signalized control in 1985. Brooklyn Boulevard (CSAH 152) is a divided four-lane roadway with dedicated left-turn lanes provided for people driving. Whereas, Welcome Avenue is a four-lane undivided roadway north of the intersection and a two-lane divided roadway south of the intersection; primarily providing access to the Village Creek neighborhood. The antiquated design of the existing infrastructure, in addition to relatively high speeds and traffic volumes, creates difficult and uncomfortable crossing experiences for people walking. This intersection experiences a high rate of crashes, ranking within the County's Top 200 intersections for crashes involving people walking as well as for crashes of all types. The proposed project will improve safety and accessibility at this intersection, including enhancements for people walking, rolling, and using transit, through the following proven design strategies as determined to be feasible: Replace and upgrade of the existing signal system to the latest technologies, including the installation of Accessible Pedestrian Signals (APS)Construction of curb extensions to promote traffic calming and reduce pedestrian crossing distances Removal of the crosswalk skew to provide a direct path of travel across Brooklyn Boulevard (CSAH 152) Upgrade of pedestrian ramps to current ADA design standards Upgrade of lighting to ensure adequate nighttime visibility Modifications to existing raised medians to create a positive offset for left-turn lanes Staff recommended this project for the Highway Safety Improvement Program (HSIP) given the high number of crashes that resulted in injuries; including a high number involving people walking. This project was awarded federal formula funding through MnDOT's 2022 HSIP As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,770,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
137
Bidding Soon
1,435
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

Brooklyn Blvd, Brooklyn Park, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.