BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Renovation of a playground / park / athletic field in Rudolph, Wisconsin. Completed plans call for the renovation of a playground / park / athletic field.

The project scope includes finishes and accessibility changes at two existing buildings. Construction on the Shower Building: Installation of plumbing fixtures, removal and replacement of existing copper piping with PEX piping, new interior finishes, new lighting, new exterior doors, new roofing fascia & soffit and toilet room specialties. Completion date for the work at this building is May 19, 2025Construc-tion on the Shelter Building: Installation of plumbing fixtures, new interior finishes. new lighting, enlarged toilet toilet rooms, new roofing fascia & soffit and toilet room specialties New overhead doors will be bid as an alternate. Completion date of work at this building is June 1st, 2025 Bids will be received as follows: CarpentryPlumbingHVACElectricalRoofing/Fascia/SoffitPainting Plans, specifications, and other bidding documents may be obtained from the architect office arc central lic 1408 Strongs Ave, Suite 102 Stevens Point, WI 54481 jlucas@arccen-trallic.com Plans, specifications, and other bidding documents may be obtained electronically from the architect. There ere is is not a fee t to obtain the documents electronically No proposal shall be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount of the amount bid, payable to the owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and a performance and payment bond in the amount of the contract price within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the owner as liquidated damages. No Bid proposal may be withdrawn for a period of sixty (30) days after the bid opening without the consent of the Owner. The Owner reserves the right to reject any or all bids, waive or not waive irregularities in the bids received and to accept any proposal which they deem most favorable to the interests of the Owner.

Post-Bid

Playgrounds / Parks / Athletic Fields

$102,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
69
Bidding Soon
719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

Project location map

205 WI-66, Rudolph, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.