Published August 12, 2025 at 8:00 PM

Updated August 15, 2025

Site work for a water / sewer project in Spring Lake, North Carolina. Completed plans call for site work for a water / sewer project.

The Project Includes the Replacement of Approximately 940 Lf of Existing Gravity Sewer Lines and Associated Manholes With Related Appurtenances Along Regina Drive in the Town of Spring Lake. The Information for Bidders, Bid Form, Contract Plans, Specifications, Bid Bond, Performance and Payment Bond, and Other Contract Documents May Be Examined at the Following The amount of the bid bond shall be equal to five (5) percent of the total of the bid. The bid deposit shall be retained by the Owner if the successful bidder fails to execute the contract or fails to provide the required bonds, as stated above, within ten (10) days after the proper notice of award of the contract. Bidders must comply with the requirements of the State of North Carolina and be appropriately licensed as a Contractor as provided in General Statutes Chapter 87. The Owner reserves the right to reject any and all Bids, to waive informalities, or to reject non-conforming, non-responsive, or conditional bids. The Owner reserves the right to award a contract to the lowest, responsive, responsible bidder or bidders, taking into consideration quality, performance and time. Contractors submitting a Bid on this project must solicit bids from minority subcontractors and provide documentation of any outreach efforts as required by the Special Conditions Packages. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda delivered by either mail or approved electronic means to all parties recorded by the Engineer as having received the Bidding Documents Question Deadline 08/08/2025 Verifiable Goals EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% These are goals that the State reports against and are not quotas. The good faith efforts must be adhered to and all forms provided regardless of what percentage utilization is achieved. State of NC MBE/WBE participation goal: 10% (combined) Table B is not required for SRP and SEL projects if you achieve 10% utilization

Post-Bid

Water / Sewer

$900,000.00

Public - City

Site Work

8

21

10

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
249
Active Projects
156
Bidding Soon
1,818
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

Multiple Locations, Spring Lake, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.