BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated September 1, 2026

Demolition, site work and addition to a power facility in Byron, Illinois. Conceptual plans call for the addition of a power facility; for the demolition of a power facility; and for site work for a power facility.

Plans call to begin development on new nuclear power plants to deliver at least two gigawatts more energy capacity, enough to power up to two million Illinois homes. As of August 26, 2026, IDCEO must give final approval for the enterprise zone boundary expansion before the project can begin to move forward. This project is in the very early planning stages. Information regarding an architect or a general contractor has not been disclosed. Although there is not a firm timeline, construction could begin in 2033. * *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Power Plant

$355,000,000.00

Public - State/Provincial

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
580
Active Projects
277
Bidding Soon
3,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2033

Project location map

To Be Determined, Byron, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.