BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work for a civil project in Byron, Illinois. Completed plans call for site work for a road / highway; and water / sewer project.

City/County : Ogle Channel Ex (154 CY); Trench Backfill (24 CY); Erosion Control Blanket (2140 SY); Temp Erosion Control Seeding (48 LB); Temp Ditch Checks (80 FT); Perm Erosion Barrier (1111 FT); inlet and Pipe Protection (2 EA); Temp Erosion Control Blanket (2140 SY); Filter Fabric (271 SY); PRecast Block Revetment Mat (72 SY); Agg Subgrade Imp (383 TON); Bit Matls (Prime Coat) (1151 LB); Bit Matls (Tack Coat) (319 LB); HMA BC, IL-19.0, N50 (190 TON); HMA SC, IL-9.5, Mix "C", N50 (109 TON); Pavt Rem (512 SY); Agg Shldrs, Ty B (151 TON); Rem Ex Superstructures (1 EA); Conc Rem (0.1 CY); P Cul Rem (66 FT); Struct Ex (28 CY); Conc Struct (0.1 CY); Precast Prestressed Conc Deck Beams (17" Depth) (2697 SF); Rebar, Epoxy Coated (30 LB); Steel Rail, Ty SM (219 FT); Name Plates (1 EA); Metal Fl End Sec, 15" (2 EA); P Cul, Cl D, Ty 1, 15" (64 FT); FullLane Sealant Waterproofing System (296 SY); Gran Backfill for Structures (28 CY); Geocomposite Wall Drain (72 SY); Pipe Underdrain for Structures, 4" (85 FT); Steel Plate Beam Guardrail, Ty A 6 FT Post (62.5 FT); Traffic Barrier Terminal, Ty 2 (2 EA); Traffic Barrier Terminal, Ty 6a (4 EA); Traffic Barrier Terminal, Ty 1 (Spl) Tangent (2 EA); Mobilization (1 LS); Terminal Marker - Direct Applied (2 EA); Guardrail Reflectors, Ty B (8 EA); Cold Milling Existing Surface (451 SY); Construction Layout (1 LS); Earth Ex (Spl) (534 CY); Seeding, CL 2A (Spl) (0.48 AC); Traffic Ctl and Prot (Spl) (1 LS); Woven Wire Fence Remove / Re-Erect (330 FT); Grouted Riprap (271 SY) ILDOT - Channel Ex (154 CY) - Mill Road This project consists of rehabilitating the existing three span (35'-5 1/2 ", 36'-1", and 35'-5 1/2 ") precast prestressed concrete deck beam bridge. This rehabilitation involves replacing the superstructure supported by spill-thru abutments. In-stream work includes placement of scour protection countermeasures at the existing piers and abutment / wingwall slopes. Improvements to the roadway include a reconstruction of the approach pavement, improved super elevations and profile, proposed guardrail, and roadside ditch grading improvements.

Bid Results

Roads / Highways

$643,662.00

Public - County

Site Work

48

3

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
481
Active Projects
269
Bidding Soon
3,273
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2025

May 5, 2025

Project location map

E Mill Rd, Byron, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.