Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 7, 2025 at 8:00 PM
Updated April 8, 2025
Site work for a civil project in Byron, Illinois. Completed plans call for site work for a road / highway; and water / sewer project.
City/County : Ogle Channel Ex (154 CY); Trench Backfill (24 CY); Erosion Control Blanket (2140 SY); Temp Erosion Control Seeding (48 LB); Temp Ditch Checks (80 FT); Perm Erosion Barrier (1111 FT); inlet and Pipe Protection (2 EA); Temp Erosion Control Blanket (2140 SY); Filter Fabric (271 SY); PRecast Block Revetment Mat (72 SY); Agg Subgrade Imp (383 TON); Bit Matls (Prime Coat) (1151 LB); Bit Matls (Tack Coat) (319 LB); HMA BC, IL-19.0, N50 (190 TON); HMA SC, IL-9.5, Mix "C", N50 (109 TON); Pavt Rem (512 SY); Agg Shldrs, Ty B (151 TON); Rem Ex Superstructures (1 EA); Conc Rem (0.1 CY); P Cul Rem (66 FT); Struct Ex (28 CY); Conc Struct (0.1 CY); Precast Prestressed Conc Deck Beams (17" Depth) (2697 SF); Rebar, Epoxy Coated (30 LB); Steel Rail, Ty SM (219 FT); Name Plates (1 EA); Metal Fl End Sec, 15" (2 EA); P Cul, Cl D, Ty 1, 15" (64 FT); FullLane Sealant Waterproofing System (296 SY); Gran Backfill for Structures (28 CY); Geocomposite Wall Drain (72 SY); Pipe Underdrain for Structures, 4" (85 FT); Steel Plate Beam Guardrail, Ty A 6 FT Post (62.5 FT); Traffic Barrier Terminal, Ty 2 (2 EA); Traffic Barrier Terminal, Ty 6a (4 EA); Traffic Barrier Terminal, Ty 1 (Spl) Tangent (2 EA); Mobilization (1 LS); Terminal Marker - Direct Applied (2 EA); Guardrail Reflectors, Ty B (8 EA); Cold Milling Existing Surface (451 SY); Construction Layout (1 LS); Earth Ex (Spl) (534 CY); Seeding, CL 2A (Spl) (0.48 AC); Traffic Ctl and Prot (Spl) (1 LS); Woven Wire Fence Remove / Re-Erect (330 FT); Grouted Riprap (271 SY) ILDOT - Channel Ex (154 CY) - Mill Road This project consists of rehabilitating the existing three span (35'-5 1/2 ", 36'-1", and 35'-5 1/2 ") precast prestressed concrete deck beam bridge. This rehabilitation involves replacing the superstructure supported by spill-thru abutments. In-stream work includes placement of scour protection countermeasures at the existing piers and abutment / wingwall slopes. Improvements to the roadway include a reconstruction of the approach pavement, improved super elevations and profile, proposed guardrail, and roadside ditch grading improvements.
Bid Results
Roads / Highways
$643,662.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
E Mill Rd, Byron, IL
Related To This Project
Byron, IL
Bid Date: Apr 02 2025
Byron, IL
Bid Date: Aug 20 2025
Byron, IL
Bid Date: Jan 27 2026
Byron, IL
Bid Date: Dec 11 2025
Byron, IL
Bid Date: Mar 05 2021
Byron, IL
--
Byron, IL
--
Byron, IL
Bid Date: Mar 07 2025
Byron, IL
Bid Date: Dec 19 2024
Byron, IL
Bid Date: Dec 17 2024
Byron, IL
Bid Date: Oct 17 2024
Byron, IL
Bid Date: Oct 02 2024
Byron, IL
Bid Date: Jul 18 2024
Byron, IL
Bid Date: Jun 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
