BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 24, 2025 at 7:00 PM

Updated February 27, 2025

Site work and new construction of an educational facility in Conroe, Texas. Completed plans call for the construction of a 107,000-square-foot, two-story above grade educational facility; and for site work for a educational facility.

Project consists of a new Elementary School with associated site work. Work includes a Library, Dining Room, Foodservice Prep Area, Classrooms, Administration Areas, Gym, All Associated Mechanical, Electrical, and Plumbing Systems. The building has a Steel Structure, With Brick Veneer and CMU Exterior, CMU and/or Metal Stud Backup Walls, and a Single-ply Membrane Roofing System and Walkway Canopies. Site Improvements May Include but Are Not Limited to Concrete Paving, Parking, Site Utilities, Storm Water Drainage. PLEASE NOTE: - Civil work (site clearing, grubbing and SWPPP) and MEP Equipment (chillers, generator and transfer switch, and main switchboard (MSB)) have bid separately. - Stewart Builders has procured the Chillers, AHUs, Generators, MSA & MSB. These are provided by the suppliers / vendors directly. - All Product and Material Substitution Request must be submitted no later than February 20th at 12:00 PM CST and be completed per spec section 01 25 13. - There will be no public opening of proposals. After receipt of proposals, Stewart Builders, LLC. will conduct its evaluation of the proposals in relation to the project. - Please note that the civil drawings will be receiving a major addendum on Friday the 14th. The Owner and Construction Manager reserves the right to reject any and all proposals, to waive any formalities and irregularities in the proposal process, and to make the awards in the best interest of Willis ISD. All proposals shall remain valid for a minimum period of sixty (60) days unless noted otherwise and will be evaluated based on the best value for Willis ISD and the project schedule. Bid Team: - Lance Burkett -346-735-0712 - lance@stewartbuildersgc.com - Korbin Mullinax - 832-405-8252 - korbin@stewartbuildersgc.com - Eman Hindic - 832-282-4481 - eman@stewartbuildersgc.com - Colby Diaz - 713-569-5094 - colbyd@stewartbuildersgc.com *Overall budget for project (not construction cost) is approximately $37,000,000. The value of this bid package is not yet known. PROJECT DESCRIPTION A. The Project consists of the Construction of a New two story Elementary School building with associated parking and drives for Willis Independent School District, Willis, Texas. Project also includes off-site utilities extensions as indicated on civil drawings that are part of this project. B. WORK: All work or portions of work necessary to provide a complete in-place, weather tight, structural sound facility as represented in the Drawings and Specifications, including, but not limited to, architectural and structural building components & associated equipment, architectural finishes, mechanical equipment and ducting, plumbing piping and fixtures, electrical equipment and fixtures, fire alarm, security and communications.

Post-Bid

Educational

$35,000,000.00

Public - City

New Construction, Site Work

246

31

101

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
128
Bidding Soon
3,694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 3, 2025

Project location map

8150 MP Clark Rd, Conroe, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.