BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Renovation of an educational facility in Aurora, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000376370 Job Location: Thunder Ridge Middle School 5250 S Picadilly St, Aurora, CO 80015 The District is seeking qualified Electrical Prime firms for this project. The project consists of demolition of the existing natural gas fired kiln with two (2) electric kilns with associated kiln fans and control interface. (The existing kiln will be removed, and the new kilns installed by CCSD's kiln contractor.) The existing kiln hood to be removed along with the kiln room ceiling and associated HVAC and electrical/fire alarm components. The existing natural gas piping to be removed back to the tee near the lower level mechanical room in the crawl space below the kiln room. Floor penetration to be patched. The existing kiln hood exhaust fan will be reused for the new kiln hood. Existing electrical components associated with the removed kiln will be removed or reused. A new lay-in ceiling will be required around the new kiln hood and reused/new HVAC and electrical/fire alarm components installed. The existing kiln hood exhaust duct to be connected to the new kiln hood. Kiln fans discharge to be ducted to exterior via roof penetrations. A new wall mounted luminaire to be installed behind the new kilns. New stepdown transformer and panelboard will be required to support the load of the new kilns. The stepdown transformer will be CCSD supplied, contractor installed. New building automation controls, fire alarm interface, and electrical will be incorporated to meet CCSD standards per a diagram on the drawings. Question Deadline 02/24/2025 at 2:00 PM MT Questions are submitted online Yes, Suppliers may make written inquiries concerning this RFP to obtain clarification of requirements. No inquiries will be accepted after the date and time indicated in the Schedule of Activities and NO phone calls will be accepted. Contract Award Project Dates: 5/27/2025-8/1/2025 CCSD further reserves the right to cancel this RFP and/or reject offers, without obligation, as determined in the best interest of the District.

Post-Bid

Educational

$217,000.00

Public - City

Renovation

14

6

7

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
64
Bidding Soon
1,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 31, 2025

Project location map

5250 S Picadilly St, Aurora, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.