Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 24, 2025
Site work, paving and outdoor lighting for a mixed-use development in North Bend, Washington. Completed plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.
9/26/25: Addendum 1 is available for this project. Construct shared use path, pedestrian trail bridge over South Fork Snoqualmie River, and improved drainage, lighting, and signage. Schedule A - Shared-Use Trail: This work includes the construction of a shared-use trail and pedestrian facilities on the north side of State Route 202 (Bendigo Boulevard North) extending from Boalch Avenue NE to the City's Wastewater Treatment Facility (WWTF), approximately 2,360 feet. Included in this work is the construction of an elevated boardwalk, concrete abutments and pedestrian bridge over South Fork Snoqualmie River, structural earth embankments, asphalt paved trail, three separate gravel access roads, pedestrian level lighting, wetland and stream mitigation planting, and surface restoration. Schedule B - WWTF Frontage Improvements: This work includes the construction of frontage improvements along State Route 202 (Bendigo Boulevard North) extending from the shared-use trail to Sydney Avenue, approximately 420 feet. Included in this work is the construction of concrete curbs, gutters and sidewalks, storm drainage improvements, pedestrian level street lighting and surface restoration. Schedule C - Sanitary Sewer ULID No. 7: This work includes the construction of approximately 210 linear feet of 8-inch HDPE sewer force main, approximately 260 linear feet of 8-inch ductile iron sewer force main across the new pedestrian bridge, approximately 570 linear feet of 12-inch PVC gravity sewer main, manholes, modifications to an existing manhole, and connections to the existing system. The Engineer's estimated total construction cost for the SR 202 Shared-Use Trail Extension is $6,395,000. The Engineer's estimated construction cost for each schedule of work are as follows: Schedule A: $5,300,000; Schedule B: $400,000; Schedule C: $695,000. The Contract shall provide 200 working days total. Length : 1.330 County: King Agency: North Bend Begin Termini : Boalch Avenue NW End Termini : 4th Avenue As of February 13, 2025, the project is in Final Planning status. Anticipated letting year is 2025. WADOT - SR 202 Shared Use Trail Extension *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. Question Deadline 10/13/2025 Questions or comments about these Bid Documents should be directed in writing only (mail or email) to the attention of: Tom Mohr, North Bend City Hall, 920 SE Cedar Falls Way, North Bend, WA 98045, or tmohr@northbendwa.gov. PID- 24421.00, 23-029
Post-Bid
Water / Sewer
$6,395,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2025
December 15, 2025
WA-202, North Bend, WA
Related To This Project
North Bend, WA
Bid Date: Aug 12 2025
North Bend, WA
Bid Date: Apr 02 2025
North Bend, WA
--
North Bend, WA
Bid Date: Apr 16 2025
North Bend, WA
Bid Date: May 07 2025
North Bend, WA
Bid Date: May 08 2025
North Bend, WA
Bid Date: May 21 2025
North Bend, WA
Bid Date: Jun 25 2025
North Bend, WA
Bid Date: May 21 2025
North Bend, WA
Bid Date: Feb 19 2025
North Bend, WA
Bid Date: Jan 29 2025
North Bend, WA
Bid Date: Dec 03 2024
North Bend, WA
Bid Date: Sep 11 2024
North Bend, WA
Bid Date: Sep 17 2024
North Bend, WA
Bid Date: Oct 03 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
