BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2025 at 8:00 PM

Updated April 3, 2025

Site work and paving for a civil project in North Bend, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Meadowbrook Improvements. Schedule A - Sanitary Sewer ULID No. 7: The work includes the construction of sewer pipe to support a future low-pressure grinder pump system, to include approximately 12,400 LF of HDPE sewer force main ranging in sizes of 2-inch to 8-inch, 40 valves ranging in sizes of 2-inch to 8-inch, 43 low-pressure sewer services, 40 locate stations, auger boring three 30-inch steel casings totaling 260 LF, 1,030 LF of 8-inch PVC gravity sewer main, 13 48-inch manholes, 21 sewer cleanouts, a. duplex grinder pump station including emergency standby generator, and associated surface restoration. In addition, the schedule will provide for the installation of a 3-inch force main by directional drilling, and installation of force mam across two existing bridges. Schedule B - NW 14th Street Water Main: The work includes the construction of approximately 1,500 LF of 12-inch DI Water Main, auger boring 145 LF of 30-inch steel casing, four fire hydrant assemblies, three 12-Inch Gate Valves, 16 water services, and associated surface restoration Schedule C - NW 14th Street Roadway Improvements: The work includes the reconstruction of approximately 1,000 LF of roadway consisting of approximately 3,400 SY of cement treated base, and 610 tons of HMA. Schedule D - NW 8th Street Water Main: The work includes the construction of approximately 2,700 LF of DI water main ranging in sizes of 8-inch to 20-inch, auger boring two 30-inch steel casings totaling 125 LF, four fire hydrant assemblies, 13 12-inch gate valves, five water services, and associated surface restoration. In addition, the schedule will provide installation of a water main across an existing bridge. The Engineer's estimated total construction cost for the Meadowbrook Improvements is $10,200,000. The Engineer's estimated construction cost for each schedule of work are as follows: Schedule A: $6,830,000; Schedule B: $1 210,000; Schedule C: $375,000; Schedule D: $1,785,000. The Contract shall provide 200 working days total. The Subcontractors List must be submitted with the Bid package within the deadline listed above. All Bid Proposals shall be accompanied by a Bid deposit in the form of a Surety Bid Bond made payable to the City of North Bend, for a sum not less than five percent (5%) of the total amount of such Bid including sales tax, and all listed additives and alternates if applicable. The subcontractors list must be submitted with the Bid Package. The City reserves the right to reject any and all bids and to waive any informalities or irregularities in the bid or in the bidding process, and make the award as deemed to be in the best interest of the City. Question Deadline 03/31/2025 Questions or comments about these Bid Documents should be directed in writing only (mail or email) to the attention of: Don DeBerg and Ted Stonebridge, North Bend City Hall, 920 SE Cedar Falls Way, North Bend, WA 98045, or ddeberg@northbendwa.gov and tstonebridge@northbendwa.gov. Questions received less than 2 business days prior to the date of Bid opening may not be answered.

Post-Bid

Water / Sewer

$10,200,000.00

Public - City

Paving, Site Work

167

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
105
Bidding Soon
1,699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

June 2, 2025

Project location map

Multiple Locations, North Bend, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.