Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Site work for a civil project in Beverly, Massachusetts. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.
Adjustment of Structures. The work under this contract consists of the adjustment of manholes, catch basins and gate boxes on various streets. Construction Methods: The Contractor shall raise the existing frames of the manholes and catch basins to the proposed new paving grade. The frames shall be set on a brick and concrete base and shall be encased in hot mix asphalt or cement concrete at the inspectors direction, to within one and one-half (1 16) inches of the top of the casting. The water gate boxes shall be adjusted and set in hot mix asphalt. Grades shall be established by the Department of Public Services.Structures to be rebuilt shall be done with materials (brick, block, etc.) of the same kind as the original structure unless approved different by the Inspector for the Department of Public ServicesConcrete barrel blocks shall be eight (8) inches deep, sixteen (16) inches long and five and onehalf (5 16) inches high in size, set in a full bed of concrete and all keyways filled completely. The work under this contract consists of the adjustment of manholes, catch basins and gate boxes on various streets. In submitting Bids for this work, Contractors are required to identify specific equipment to be used on the project. Bricks shall be set in a fan shape, (soldier course) in a full bed of mortar and shall be parged inside the structure after the frame has been set. Stretcher courses are not acceptable.No frame, grate, cover or box shall be reset if damaged or broken unless specified by the Inspector. All inverts, tables and pipes shall be inspected and cleaned after adjustment of frames. If pipelines become plugged do to construction debris falling into them, the Bidder will be responsible for the costs to remove said obstructions.Concrete mix shall be as follows: o Three (3) parts Sand (brick sand) o Two (2) parts Portland Cement o Thoroughly mix with water to a smooth, creamy consistency. Hot Mix Asphalt shall be as follows: o Three-Quarter (%) inch Binder
Post-Bid
Roads / Highways
$202,500.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
March 31, 2025
Multiple Locations, Beverly, MA
Related To This Project
Beverly, MA
Bid Date: Feb 27 2025
Beverly, MA
Bid Date: Mar 06 2025
Beverly, MA
Bid Date: Mar 12 2025
Beverly, MA
Bid Date: May 28 2025
Beverly, MA
Bid Date: Mar 21 2025
Beverly, MA
Bid Date: Mar 21 2025
Beverly, MA
Bid Date: Apr 02 2025
Beverly, MA
Bid Date: Apr 30 2025
Beverly, MA
Bid Date: Feb 20 2025
Beverly, MA
Bid Date: Feb 19 2025
Beverly, MA
Bid Date: Jan 29 2025
Beverly, MA
Bid Date: Jan 29 2025
Beverly, MA
Bid Date: Feb 06 2025
Beverly, MA
Bid Date: Jan 29 2025
Beverly, MA
Bid Date: Jan 29 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed