BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work for a civil project in Beverly, Massachusetts. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

Adjustment of Structures. The work under this contract consists of the adjustment of manholes, catch basins and gate boxes on various streets. Construction Methods: The Contractor shall raise the existing frames of the manholes and catch basins to the proposed new paving grade. The frames shall be set on a brick and concrete base and shall be encased in hot mix asphalt or cement concrete at the inspectors direction, to within one and one-half (1 16) inches of the top of the casting. The water gate boxes shall be adjusted and set in hot mix asphalt. Grades shall be established by the Department of Public Services.Structures to be rebuilt shall be done with materials (brick, block, etc.) of the same kind as the original structure unless approved different by the Inspector for the Department of Public ServicesConcrete barrel blocks shall be eight (8) inches deep, sixteen (16) inches long and five and onehalf (5 16) inches high in size, set in a full bed of concrete and all keyways filled completely. The work under this contract consists of the adjustment of manholes, catch basins and gate boxes on various streets. In submitting Bids for this work, Contractors are required to identify specific equipment to be used on the project. Bricks shall be set in a fan shape, (soldier course) in a full bed of mortar and shall be parged inside the structure after the frame has been set. Stretcher courses are not acceptable.No frame, grate, cover or box shall be reset if damaged or broken unless specified by the Inspector. All inverts, tables and pipes shall be inspected and cleaned after adjustment of frames. If pipelines become plugged do to construction debris falling into them, the Bidder will be responsible for the costs to remove said obstructions.Concrete mix shall be as follows: o Three (3) parts Sand (brick sand) o Two (2) parts Portland Cement o Thoroughly mix with water to a smooth, creamy consistency. Hot Mix Asphalt shall be as follows: o Three-Quarter (%) inch Binder

Post-Bid

Roads / Highways

$202,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
190
Bidding Soon
3,724
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 31, 2025

Project location map

Multiple Locations, Beverly, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.