Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated June 17, 2025

Site work for a sidewalk / parking lot in West Allis, Wisconsin. Completed plans call for site work for a sidewalk / parking lot.

In general, the work consists of: Demolishing approximately 1,225 feet of existing chain link fence and replacing with a new chain link fence. The project will also require existing vegetation adjacent to and intertwined with the existing fence be clear cut and/or pruned. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $100,000. All bids received from contractors who are not certified will be rejected.

Award

Sidewalks / Parking Lot

$195,875.00

Public - State/Provincial

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
361
Active Projects
146
Bidding Soon
2,804
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 21, 2025

Project location map

640 S 84th St, West Allis, WI


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed