Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated March 27, 2025
Renovation of a residential development in Bossier City, Louisiana. Completed plans call for the renovation of a residential development.
ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY THE HOUSING AUTHORITY OF THE CITY OF SHREVEPORT OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE BID OPENING. FOR: Fire Damage Repairs - 2106 Scott Street, Bossier City, LA Roofing Repairs - 2147 Scott Street, Bossier City, LA PROJECT NUMBER: __NMI 240280___________________ Housing Authority of the City of Bossier City All prime bidders shall obtain an original set of electronic bidding documents from the Professional of Record as noted below. The Professional of Record shall maintain a list of all prime bidders for the purpose of Addenda distribution. (RS 38:2212)(D). Questions about this procedure shall be directed to the Designer at: Newman Marchive Incorporated 2800 Youree Drive, Suite 310 Shreveport, LA 71104 Telephone: 318-562-5430 or 318-219-1814 dmathias@newmaninc.com All bids shall be accompanied by bid security in an amount of five percent (5.0%) of the sum of the base bid and all alternates. The form of this security shall be as stated in the Instructions to Bidders included in the Bid Documents for this project. The successful Bidder shall be required to furnish a Performance and Payment Bond written as described in the Instructions to Bidders included in the Bid Documents for this project. Bids shall be accepted from Contractors who are licensed under LA. R.S. 37:2150-2192 for the classification of Building Construction. Bidder is required to comply with provisions and requirements of LA R.S. 38:2212(B)(5). No bid may be withdrawn for a period of forty-five (45) days after receipt of bids, except under the provisions of LA. R.S. 38:2214. The Owner reserves the right to reject any and all bids for just cause. In accordance with La. R.S. 38:2212(B)(1), the provisions and requirements of this Section; and those stated in the bidding documents shall not be waived by any entity. Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written. Oral requests must be confirmed in writing
Award
Residential Subdivision
$104,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2025
April 3, 2025
2147 Scott St, Bossier City, LA
Related To This Project
Bossier City, LA
Bid Date: May 13 2025
Bossier City, LA
Bid Date: Mar 13 2025
Bossier City, LA
Bid Date: Apr 03 2025
Bossier City, LA
Bid Date: Apr 22 2025
Bossier City, LA
Bid Date: May 12 2025
Bossier City, LA
Bid Date: May 20 2025
Bossier City, LA
--
Bossier City, LA
Bid Date: May 01 2025
Bossier City, LA
Bid Date: Mar 04 2025
Bossier City, LA
Bid Date: Mar 11 2025
Bossier City, LA
Bid Date: Jan 14 2025
Bossier City, LA
--
Bossier City, LA
--
Bossier City, LA
Bid Date: Jan 07 2025
Bossier City, LA
Bid Date: Jan 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
