Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Site work, paving and outdoor lighting for a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; bridge / tunnel; bridge / tunnel; and for outdoor lighting for a bridge / tunnel.
Fort Apache Road to Peace Way The project is located in Clark County, Nevada, adjacent to Clark County 215 from just south of Peace Way to just north of Fort Apache Road. The project constructs an approximately 1,635-foot segment of trail connecting the existing Clark County 215 Western Beltway Trail south of Peace Way to the segment north of Fort Apache Road to provide trail continuity. The improvements generally consist of a concrete trail, retaining walls and fencing, ramps, pedestrian bridge, storm drain improvements, landscape grading and mulch, road re-striping, construction traffic control, and other related items of work. The work includes removals and disposal of designated improvements including fencing, gates, bollards, and barrier rail, and other related items of work. Charleston Boulevard Undercrossing will consist of concrete trail ramps with cast-in-place retaining walls that lead down to 14 foot wide x 12 foot high pre-cast RCB undercrossings at both the CC 215 Charleston Boulevard southbound on-ramp and off-ramp. Headwalls tie the undercrossing to the ramps. A concrete trail connects the two pre-cast RCB undercrossings together and passes underneath the west abutment of the existing Charleston Bridge over CC 215 Beltway. A concrete retaining wall along west side of beltway under the Charleston Bridge will be constructed to elevate trail above beltway. Roadway improvements to include removal and reconstruct portions of Charleston Blvd off-ramp and on-ramp and portions of Charleston Blvd, cold planing, plantmix bituminous surface and base, UTACS, curb and gutter reconstruction, concrete barrier rail, utility adjustments, signage, impact attenuator, pavement markings along with associated traffic control and dust control. Trail improvements to include lights for trail and undercrossing, landscaping rock, removable bollard, chain-link fence, and decorative fence. BID SECURITY in the amount of five percent (5%) of the Total Base Bid amount in the form of a Cashier's Check, Certified Check, Money Order, or Bid Bond, scanned into the Response Attachments tab. 1. Labor and Material Payment Bond in the amount of 100% of the Contract price. 2. Performance Bond in the amount of 100% of the Contract price. 3. Guaranty Bond in the amount of 100% of the Contract price. In case of failure on the part of Contractor to complete the work within the time(s) specified in the Contract, or with such additional time(s) as may be granted by formal change order, or if Contractor fails to perform the work, or any separable part thereof, with such diligence as will insure its completion within the time(s) specified in the contract or any extensions thereof, Contractor shall pay to COUNTY, as liquidated damages, the sum of $1,500.00 for each calendar day of delay until the work is complete, together with any increased costs incurred by COUNTY in completing the work. Successful Bidder, upon becoming the awarded Contractor, shall commence the work to be performed on the date set by COUNTY'S departmental representative in the written Notice to Proceed, continuing the work in accordance with the approved schedule and shall complete the entire work within 270 calendar days from the date specified in the Notice to Proceed. ESTIMATED COST: $19,367,944 - $21,406,674. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions regarding this bid must be directed to the Bid Contact listed in this bid. Question Deadline 04/14/2025 at 5:00 PM PT Should you have any questions, please contact me at (702) 455-4441 or scott.jones@clarkcountynv.gov
Award
Roads / Highways
$18,665,000.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 21, 2025
June 16, 2025
I-215 West Beltway Trl, Las Vegas, NV
Related To This Project
Las Vegas, NV
Bid Date: Apr 02 2025
Las Vegas, NV
Bid Date: Mar 11 2025
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Mar 26 2025
Las Vegas, NV
Bid Date: Apr 21 2025
Las Vegas, NV
Bid Date: Mar 03 2025
Las Vegas, NV
--
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Mar 04 2025
Las Vegas, NV
Bid Date: Mar 11 2025
Las Vegas, NV
--
Las Vegas, NV
Bid Date: Feb 24 2025
Las Vegas, NV
Bid Date: Mar 20 2025
Las Vegas, NV
Bid Date: Mar 11 2025
Las Vegas, NV
Bid Date: Mar 11 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
