Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2025 at 7:00 PM
Updated March 6, 2025
Renovation of a municipal facility in Farmington, Wisconsin. Completed plans call for the renovation of a municipal facility.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Estimate construction cost : $6,500,000 ** bid date info : Sealed bids will be received as follows, before the time indicated above: PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) submitted via online l (this is the preferred method)
Bid Results
Municipal
$11,512,511.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
May 1, 2025
To Be Determined, Farmington, WI
Related To This Project
Farmington, WI
Bid Date: Jun 27 2025
Farmington, WI
Bid Date: Nov 12 2024
Farmington, WI
--
Farmington, WI
--
Farmington, WI
Bid Date: May 14 2024
Farmington, WI
Bid Date: Jun 19 2023
Farmington, WI
Bid Date: May 24 2023
Farmington, WI
Bid Date: Mar 14 2023
Farmington, WI
--
Farmington, WI
Bid Date: Mar 21 2022
Farmington, WI
Bid Date: Aug 09 2022
Wisconsin Rapids, WI
Bid Date: Mar 05 2025
Oshkosh, WI
Bid Date: Mar 27 2025
Oconto, WI
Bid Date: Mar 05 2025
Beloit, WI
Bid Date: Mar 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
