Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work for a mixed-use development in Pahoa, Hawaii. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

The Contractor shall excavate down to the 90 elbow of the existing fire department connection and 4" pvc waterline below ground level. Contractor shall ensure that the 4" pvc waterline connecting to the 90 is not damaged. The Contractor shall remove any damaged 4"pvc waterline and replace, if necessary. If the removal and replacement of the concrete pavement is necessary to replace any damaged 4" pvc waterline the contractor shall also replace the concrete pavement per detail 4/C-3. This additional work will be paid under the "Allowance for Additional Work. The Contractor shall remove and replace the 4" hot dip galvanized (HDG) schedule 40 metal pipe, bronze 2-way ball valve, and 4" x 2-1/2" Siamese wye fire department connection, refer to detail 1/C-3. The Contractor shall remove and replace the existing 4" concrete filled bollard and signpost, per details 2/C-3 and. The Contractor shall visit the site and verify all existing conditions prior to submitting a bid for this project. Pahoa Transfer Station is open dailyfrom 6:00 a.m. to 6:00 p.m. 7 days a week. The Contractor may visit the site at anytime during the normal operational days and hours. 3. The Contractor shall excavate down to the 90 elbow of the existing fire department connection and 4" pvc waterline below ground level. Contractor shall ensure that the 4" pvc waterline connecting to the 90 is not damaged. 4. The Contractor shall remove any damaged 4"pvc waterline and replace, if necessary. If the removal and replacement of the concrete pavement is necessary to replace any damaged 4" pvc waterline the contractor shall also replace the concrete pavement per detail 4/C-3. This additional work will be paid under the "Allowance for Additional Work." 5. The Contractor shall remove and replace the 4" hot dip galvanized (HDG) schedule 40 metal pipe, bronze 2-way ball valve, and 4" x 2-1/2" Siamese wye fire department connection, refer to detail 1/C3. 6. The Contractor shall remove and replace the existing 4" concrete filled bollard and signpost, per details 2/C-3 and . 7. The Contractor shall provide all traffic control devices or personal as necessary. 8. All County of Hawai'i Solid Waste Division Operations shall remain open to the public and operations staff during the construction work during regular operational hours for the Pahoa Transfer Station

Award

Water / Sewer

$26,335.00

Public - County

Site Work

6

12

4

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
5
Bidding Soon
34
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.