BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Renovation of an educational facility in Oshkosh, Wisconsin. Completed plans call for the renovation of a educational facility.

OWNER: State of Wisconsin, Department of Administration, Division of Facilities Development, hereinafter termed DFD All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. All bids received from contractors who are not certified will be rejected. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website DFD Contractor Certification page: online or upon request from DFD--email 24 dfdcertification@wisconsin.gov This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include mechanical, electrical, plumbing, or fire protection, DFD will bid one for all work to general prome contractors. The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via the eBuilder Bid Portal before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk. In general, the work consists of: replacing all chemical storage cabinets, exhaust ductwork and fans for the ventilated cabinets, fume hoods and utility fixtures, work counters, base cabinets, and sinks. Replacement storage cabinets, base cabinets, fume hoods, exhaust ductwork, and exhaust fans should be constructed of materials with maximum practical chemical resistance. All electrical and plumbing connections will be modified and reworked as necessary to connect the new laboratory fixtures. The chemical resistant epoxy flooring will be recoated. New deionized water service will be installed for the center island sinks and fume hoods. All light fixtures will be replaced. All supply, return, and exhaust grilles will be repainted or replaced if damaged or rusted. The design solution and room configuration will provide a 2-station computer work area appropriately separated from the chemical area to allow completion of required documentation and record keeping CLASS 1 NOTICE: Notice is hereby given in accordance with Section 16.855(10), Wisconsin Statutes, that the Division believes it is in the best interests of the State to contract the following work from only one source, 17 without the usual statutory procedures: Door Hardware 08 71 00 Door Hardware Access Controls 28 10 00 Access Controls Bid submissions will occur in a unique bid portal link available in each bid advertisement. After opening the bid portal link, confirm your company and contact details, then click save.. No deposit is required to obtain documents for bidding purposes. Base Bid will be received for: A single lump sum bid for All Work Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Contract offer and construction phase records will be processed electronically via eBuilder. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available online immediately upon the project being advertised for bid. Estimate Construction Cost $610,000 Custom Bid result Plumbing : Ahern Gross, Inc -$30,900.00 Electrical : H D.E.Thome Electrical Contracting, Inc - $48,580.00

Bid Results

Educational

$79,480.00

Public - State/Provincial

Renovation

13

26

2

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
132
Bidding Soon
1,111
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 28, 2025

Project location map

800 Algoma Blvd, Oshkosh, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.