BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work and paving for a mixed-use development in Saint Croix Falls, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified 14 contractors for the above project. 15 16 All potential bidders must become certified by DOA prior to submitting bids on state construction projects 17 with budgets over $100,000. All bids received from contractors who are not certified will be rejected. These 18 changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA Website. DFD Contractor Certification page : online In general, the work consists of: removing the existing trees, yard hydrant, concrete slab, pressure tank, associated plumbing, abandon well and associated electrical controls. Installing a new well, associated electric and plumbing, pressure tank, slab, sanitary yard hydrant, sidewalk, and grading. The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via online Bid Portal before the time specified for the bid submission. Third party delivery is entirely at the bidders risk. Contract offer and construction phase records will be processed electronically via Online. 53 54 The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins prevailing wage laws. 55 Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. 56 These changes take effect for projects advertised for bid after September 23, 2017. This change does not 57 affect the Federal Davis Bacon Act requirements. Construction bidding documents may also be available at various Website. Additional project bidding information, including plan holders lists are available on the Division of Facilities Development public website. Bid submissions will occur in a unique bid portal link available in each bid advertisement. After opening the bid portal link, confirm your company and contact details. Estimate Construction Cost : 120,000

Bid Results

Water / Sewer

$101,200.00

Public - State/Provincial

Paving, Site Work

12

15

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
129
Bidding Soon
1,468
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

June 2, 2025

Project location map

1275 WI-35, Saint Croix Falls, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.