BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work and paving for a sidewalk / parking lot in Milwaukee, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

2025 ADA Ramps for High Impact Paving - South Side Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5" Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6" Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; ST216240112 - ADA Ramps for 2025 High Impact Pacing @ Various Locations (South Side Projects) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee "High Impact" asphalt paving projects. The "High Impact" asphalt paving projects are as follows. O.N. 10-1-2025 N. 51st St. - W. North Ave. to W. Lisbon Ave. N. 53rd St. - W. Lisbon Ave. to W. Burleigh St. S. 57th St. - W. Morgan Ave. to W. Oklahoma Ave. N. 58th St. - W. Mc. Kinley Ave. to W. Washington Bl. (skip W. Vliet St. to W. Galena St.) N. 60th St. - W. Fairview Ave. to W. Blue Mound Rd. S. 85th St. - W. Holt Ave. to W. Euclid Ave. S. 86th St. - W. Morgan Ave. to W. Euclid Ave. W. Dakota St. - S. 49th St. to S. 51st St. W. Dickinson St. - S. 68th St. to S. 70th St. W. Holt Ave. - S. 79th St. to S. 80th St. W. Park Hill Ave. - N. 90th St. to N. 91st St. W. Stack Dr. - S. 55th St. to S. 60th St. S. Tennessee Ave. - W. Van Norman Ave. to S. Louisiana Ave. O.N. 11-1-2025 S. 5th Pl. - A Point South of W. Plainfield Ave. to W. Howard Ave. S. 22nd St. - W. Carpenter Ave. to W. Layton Ave. W. Arthur Ave. - S. 13th St. to S. 16th St. (retain speed hump) S. Austin St. - E. Armour Ave. to E. Norwich Ave. W. Becher St. - S. Muskego Ave. to S. 24th St. (retain speed hump) W. Bruce St. - S. 12th St. to W. Reynolds Pl. W. Halsey Ave. - S. 18th St. to S. 20th St. E. Howard Ave. - East City Limits to S. Clement Ave S. Linebarger Tr. - S. Kinnickinnic Ave. to E. Iron St. S. Logan Ave. - E. Conway St. to E. Lincoln Ave. W. Pierce St. - S. 16th St. to W. Reynolds St. S. Superior St. - E. Russell Av. to E. Conway St.

Award

Sidewalks / Parking Lot

$906,160.00

Public - City

Paving, Site Work

79

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
339
Active Projects
196
Bidding Soon
1,886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

Multiple Locations, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.