BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated November 4, 2025

Renovation of an educational facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of: Removal and replacement of large sections of face brick, masonry tuckpointing, masonry unit crack repair and replacement, face brick and angle replacement, steel lintel replacement and tuckpointing repairs, stone trim and medallion repairs, and concrete sill repair and replacement at window openings. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Bidders are welcome to visit the site to walk the exterior to see conditions at any time. AE Firm: Specialty Engineering Group, LLC Contact: Sandro Storniolo, Project Manager Email: sstorniolo@str-seg.com Telephone: (414)-614-0279 (C) US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7th Floor, 101 East Wilson Street, Madison, Wisconsin 53703; or Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. Online bid opening: https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_NmIxOWU2MzEtODJkNi00ZDFiLThiOTYtYTZiMjM0MzNjZDU5%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522f4e2d11c-fae4-453b-b6c0-2964663779aa%2522%252c%2522Oid%2522%253a%252216987bcd-db9d-4075-aa58-5b60d229f4e3%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=4cc1d095-f95b-4448-8a34-c313893192c1&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Award

Educational

$3,086,000.00

Public - State/Provincial

Renovation

14

13

10

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
186
Bidding Soon
1,854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

April 28, 2025

Project location map

3203 N Downer Ave, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.