Published March 6, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Construction of Handicap Concrete Ramps Per ADA Requirements, Construction Staking of Ramps, Detectable Warning Field, 5" Concrete Walk, Concrete Walk and/or Driveway, Concrete Curb & Gutter, 6" Concrete Pavement Variable Thickness Concrete Base, Variable Thickness Asphaltic Concrete Pavement, Various Concrete Removals, Sewer Work, Installation of Conduit and other Appurtenance Underground Work, ETC.; Located at: ST216240112 - ADA Ramps for 2025 High Impact Pacing @ Various Locations (South Side Projects) The scope of this contract is to remove and replace all of the pedestrian ramps within the limits of each of the City of Milwaukee "High Impact" asphalt paving projects. The "High Impact" asphalt paving projects are as follows. O.N. 10-1-2025 N. 51st St. - W. North Ave. to W. Lisbon Ave. N. 53rd St. - W. Lisbon Ave. to W. Burleigh St. S. 57th St. - W. Morgan Ave. to W. Oklahoma Ave. N. 58th St. - W. Mc. Kinley Ave. to W. Washington Bl. (skip W. Vliet St. to W. Galena St.) N. 60th St. - W. Fairview Ave. to W. Blue Mound Rd. S. 85th St. - W. Holt Ave. to W. Euclid Ave. S. 86th St. - W. Morgan Ave. to W. Euclid Ave. W. Dakota St. - S. 49th St. to S. 51st St. W. Dickinson St. - S. 68th St. to S. 70th St. W. Holt Ave. - S. 79th St. to S. 80th St. W. Park Hill Ave. - N. 90th St. to N. 91st St. W. Stack Dr. - S. 55th St. to S. 60th St. S. Tennessee Ave. - W. Van Norman Ave. to S. Louisiana Ave. O.N. 11-1-2025 S. 5th Pl. - A Point South of W. Plainfield Ave. to W. Howard Ave. S. 22nd St. - W. Carpenter Ave. to W. Layton Ave. W. Arthur Ave. - S. 13th St. to S. 16th St. (retain speed hump) S. Austin St. - E. Armour Ave. to E. Norwich Ave. W. Becher St. - S. Muskego Ave. to S. 24th St. (retain speed hump) W. Bruce St. - S. 12th St. to W. Reynolds Pl. W. Halsey Ave. - S. 18th St. to S. 20th St. E. Howard Ave. - East City Limits to S. Clement Ave. S. Linebarger Tr. - S. Kinnickinnic Ave. to E. Iron St. S. Logan Ave. - E. Conway St. to E. Lincoln Ave. W. Pierce St. - S. 16th St. to W. Reynolds St. S. Superior St. - E. Russell Av. to E. Conway St. Time for Completion: All work on this contract shall be completed by October 1, 2025. Liquidated Damages, per diem: $500.00/Day The residency requirement for this project is 40% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. The apprenticeship requirements for this project are: 0%. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid.

Bid Results

Roads / Highways

$906,160.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
102
Bidding Soon
1,319
All Active Projects
699
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 26, 2025

img_map_placeholder

Multiple Locations, Milwaukee, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sidewalk High Impact Paving Work

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.