BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work and paving for a mixed-use development in Wauwatosa, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for water main construction, sanitary sewer laterals, storm sewer inlets and catch basin construction, asphalt repaving and reconstruction including grading, concrete curb and gutter replacement, asphalt pavement, ADA curb ramps, pavement markings and work incidental thereto in portions of Center Street: From: N 113th Street To: N 118th Street all in accordance with contract documents. All proposals must be submitted in electronic format together with a bid bond equal to five (5) percent of the bid payable to the City of Wauwatosa, Wisconsin, as a guarantee that if his bid is accepted, the successful bidder will execute and file the proper contract and bonds within ten (10) days after notification of award of the contract. contract Failure on the part of the successful bidder to execute his contract and performance and labor & material payment bonds within ten (10) days from the date of notice of the award of will be considered as just cause for the annulment of the award and the forfeiture of the proposal guarantee to the City not as a penalty but in payment to the City as liquidated damages as a result of such failure. No bid shall be withdrawn after the opening of bids for a period of sixty (60) days after the scheduled time of closing. of bids. The letting of the work described herein is subject to the provisions of Section 66.09. Wisconsin Statutes, requiring the bidder to furnish proof of responsibility. Bidder prequalification is required on forms furnished by the City of Wauwatosa and submitted to the City Engineer. Prequalification forms that are submitted after 5 days preceding the contract letting date may be cause for the rejecting of bids TIME OF SUBSTANTIAL COMPLETION The substantial completion date for Contract 25-08 Center Street Improvements shall be August 22, 2025. See Section 600 for additional completion requirements. If the contractor does not complete the work on or before the date set forth above for Center Street Improvements or within the extra time allowed under a City Engineer granted time extension, the City will assess liquidated damages. The City will deduct one thousand five hundred hur seventy dollars ($1,570.00) for every calendar day that the work remains. uncompleted from payments due the contractor. The right to reject or accept any or all bids and the right to waive any informality in bidding is reserved to the City of Wauwatosa, Wisconsin.

Award

Roads / Highways

$1,414,080.00

Public - City

Paving, Site Work

87

9

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
299
Active Projects
47
Bidding Soon
2,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

Project location map

W Center St, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.