BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a mixed-use development in Myrtle Beach, South Carolina. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Approximately 5,100 SF of concrete rehabilitation at Substation #4. Contingent on the cost of the concrete, the City is interested in repaving approximately 4,500 SF of asphalt driveway of Substation #4. IFB forms and requirements may be obtained from the Procurement Office at 3231 Mr. Joe White Avenue, Myrtle Beach. No late or electronic submissions will not be accepted. The City is not responsible for late or misdirected mail.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
51
Bidding Soon
688
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

1298 Howard Ave, Myrtle Beach, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.