Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2025 at 7:00 PM
Updated March 12, 2025
This is a service / maintenance or supply contract in Madison, Wisconsin. Contact the soliciting agency for additional information.
All referenced figures can be found in the attached Narrative file, found in the supplementary documents section. Mississippi River backwaters within Pool 6 are currently a high priority resource for WI DNR due to a general lack of deep, backwater habitat within the pool (Figure 2). Recent flood and high discharge conditions have resulted in declining water quality conditions due to an influx of channel sand into the main inlet to the complex. The channel inlet at RM 624.5 is currently blocked by sediment during normal and low flow conditions. This channel flows under a bridge into the middle of the complex during above normal river stages and can have a positive influence on WQ conditions in deeper water located along the tracks in the lower portion of the complex when flow is present. However, reduced flow delivery to the system results in periods when winter water quality conditions are outside temperature and dissolved oxygen ranges required for overwintering backwater fish communities. Recent surveys conducted under near-median discharge conditions indicated widespread hypoxia in the complex (Figure 3). Fish kills in Sam Gordy's Slough are likely to occur in the coming years if no action is taken. Water Quality monitoring conducted by the WI DNR identifies hydraulic connectivity as the primary water quality driver in Sam Gordy's Slough. A detailed rating curve has been developed for inflows into Sam Gordy's Slough (Figure 4). When main channel water input to the slough is low, dissolved oxygen declines precipitously. A low-cost project to optimize multi-season connectivity (summer and winter) will produce substantial water quality and ecological benefits within this complex. Questions from vendors are due February 28, 2025 at 4:30 PM
Post-Bid
Water / Sewer
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 10, 2025
Multiple Locations, Madison, WI
Related To This Project
Madison, WI
Bid Date: Mar 12 2025
Madison, WI
Bid Date: Mar 11 2025
Madison, WI
Bid Date: Mar 10 2025
Madison, WI
Bid Date: Feb 20 2025
Madison, WI
Bid Date: Apr 10 2025
Madison, WI
--
Madison, WI
Bid Date: Feb 27 2025
Madison, WI
Bid Date: Apr 17 2025
Madison, WI
Bid Date: Feb 28 2025
Madison, WI
Bid Date: Feb 27 2025
Madison, WI
Bid Date: Feb 27 2025
Madison, WI
Bid Date: Mar 18 2025
Madison, WI
Bid Date: Mar 12 2025
Madison, WI
Bid Date: Mar 13 2025
Madison, WI
Bid Date: Mar 14 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
