EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 18, 2025 at 7:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Chico, California. Contact the soliciting agency for additional information.

The Board of Trustees of the California State University is requesting Statements of Qualifications (SOQ) from interested and qualified general contractors (Respondents) to provide design-build and construction manager services with lump sum pricing for the design, preconstruction, and construction of multiple projects under a master enabling agreement. The delivery method for this contract is Task Order-Construction Agreement for Multiple Projects- Master Enabling Agreement (TO-CA MEA). The Trustees will issue two types of agreements under the TO-CA MEA-a task order for the design and preconstruction phase services and a construction agreement for the construction phase. Trustees' Budget for All Projects: NTE $30,000,000.00 Trustees' Maximum Budget per Project: NTE $7,000,000.00 Maximum Term of TO-CA MEA: Three (3) years {from OGC approval of MEA} Contractor License Requirement: B The Trustees require three percent (3%) Disabled Veteran Business Enterprise participation in all contracts. The Trustees shall assign up to three bonus points for the DVBE incentive, in the RFP Technical Proposal Phase of the selection process, if the proposer stipulates that they shall realize certain DVBE participation during the construction phase. If Proposer stipulates 6.0% or better, Trustees will award three bonus points; 5.0%-5.99%, two bonus points, 4.0-4.99%, one bonus point. The three percent participation requirement applies to the overall TO-CA MEA. When it nears time to bid trades, the selected construction manager shall contact the Trustees' DVBE Coordinator at Lori Rice at lmrice@csuchico.edu (530) 898-5629.

Post-Bid

Educational

$30,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
20
Bidding Soon
304
All Active Projects
130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

img_map_placeholder

Multiple Locations, Chico, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Task Order-Construction Agreement for Multiple Projects

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.