Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 19, 2025 at 7:00 PM
Updated April 10, 2025
Renovation of a theater / auditorium in Durham, North Carolina. Conceptual plans call for the renovation of a theater / auditorium.
University Theatre Renovation (Farrison-Newton Building) North Carolina Central University (NCCU) is seeking an experienced and innovative design team to lead a comprehensive renovation project for the University Theater located in the Farrison-Newton Building. This ambitious endeavor aims to transform the existing facilities into a state-of-the-art theater that will not only enhance the university's artistic offerings but also provide a versatile space for a variety ofperformances and events The renovation project will encompass the following key areas: 1. Theater Renovation: o Complete overhaul ofthe 264-seat University Theater to improve audience experience and acoustics. o Upgrade ofstage lighting and control systems to modem standards. 2. Adjacent Rooms and Support Spaces: o Renovation of all adjacent rooms used for rehearsals, dressing/undressing, and other support functions. o Expansion and modernization ofthe carpentry and fabrication shop to support production needs. 3. Mechanical, Electrical, and Plumbing (MEP) Upgrades: o Comprehensive HVAC systems upgrades to ensure optimal climate control and energy efficiency. o Electrical system enhancements to support advanced lighting, audio-visual, and production equipment. o Integration ofstate-of-the-art audio-visual systems for superior performance quality and audience engagement. 4. Security and Code Compliance: o Implementation ofmodem security measures to ensure the safety ofperformers, staff, and audiences. o Addressing all code-related items to ensure the theater meets current building regulations and standards.
Conceptual
Theaters / Auditoriums
$8,500,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2026
501 E Lawson St, Durham, NC
Related To This Project
Durham, NC
Bid Date: Mar 12 2025
Durham, NC
Bid Date: Mar 25 2025
Durham, NC
Bid Date: Jun 03 2025
Durham, NC
Bid Date: Mar 24 2025
Durham, NC
--
Durham, NC
Bid Date: Mar 13 2025
Durham, NC
Bid Date: Mar 14 2025
Durham, NC
Bid Date: Mar 07 2025
Durham, NC
Bid Date: Mar 07 2025
Durham, NC
Bid Date: Mar 13 2025
Durham, NC
Bid Date: Mar 18 2025
Durham, NC
Bid Date: Mar 11 2025
Durham, NC
Bid Date: Mar 06 2025
Durham, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
