BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 13, 2025

Renovation of a fire / police facility in Boynton Beach, Florida. Completed plans call for the renovation of a 26,700-square-foot fire / police facility.

The City of Boynton Beach "City" Public Works Engineering Department is requesting sealed bids from qualified and experienced firms to provide construction services for the re-roofing, waterproofing and painting of Boynton Beach Fire Station #5 located at 2080 High Ridge Road, Boynton Beach, Florida 33426. The project consists of providing approximately 26,700 square feet of re-roofing over the existing waterproof roofing, removal and/or replacement wood trellis roof on east side of the building, the removal / replacement of existing joint sealants and the repainting of the existing building exterior in its entirety. Question Deadline: Fri Mar 7, 2025 5:00:00 PM (EST)

Bid Results

Fire / Police

$388,402.00

Public - City

Renovation

13

13

6

7

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
3
Bidding Soon
1,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 16, 2025

Project location map

2080 High Ridge Rd, Boynton Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.