Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 26, 2025 at 7:00 PM
Updated February 27, 2025
Site work, paving and new construction of a civil project in Bloomington, Illinois. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Pre-Qualification is Required. 2025 Non-MFT Construction Section McLean County 23-00044-14-BR Golden Bridge (CH 21) Removal of existing structure and construction of a 3 span concrete slab bridge, Guardrails and Hot-Mix Asphalt approaches. Pre-qualification is not required. 2025 Material Bid Cheney's Grove Road District 25-08000-00-JT. Consists of supplying and delivering a 11'-8" x 5'-9" Aluminum Box Culvert along with full aluminum invert, headwalls, and 4'-6" aluminum wingwalls. McLean County reserves the right to reject any, and all proposals and to waive technicalities.
Bid Results
Bridges / Tunnels
$1,014,470.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 25, 2025
March 27, 2025
To Be Determined, Bloomington, IL
Related To This Project
Bloomington, IL
Bid Date: Mar 13 2025
Bloomington, IL
--
Bloomington, IL
Bid Date: Apr 15 2025
Bloomington, IL
--
Bloomington, IL
Bid Date: Mar 19 2025
Bloomington, IL
Bid Date: Apr 01 2025
Bloomington, IL
Bid Date: Mar 21 2025
Bloomington, IL
Bid Date: Mar 27 2025
Bloomington, IL
Bid Date: Mar 14 2025
Bloomington, IL
Bid Date: Mar 19 2025
Bloomington, IL
Bid Date: Feb 26 2025
Bloomington, IL
--
Bloomington, IL
Bid Date: Feb 14 2025
Bloomington, IL
Bid Date: Jan 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
