Published March 16, 2025 at 8:00 PM

Updated March 17, 2025

Site work, paving and outdoor lighting for a transportation facility in Belgrade, Montana. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.

Runway 12-30 Pavement Marking Project includes 137,800 SF of runway pavement markings and 147,500 SY of runway asphalt seal coat. Work includes pavement marking removal, airfield lighting modifications and airfield signage relocations. This work is to include all tools, equipment, materials, and labor to complete this project. The bidder's name, address and state Contractor's Registration Payment Bond, each in the amount of one hundred percent (100%) of the contract. The Contractor will be required to comply with Number shall appear in the lower left-hand corner of the envelope. Bid Bond. All bids must be accompanied by lawful monies of the United States or a Cashier's Check, a Certified Check, Bid Bond, Bank Money Order or Bank Draft, drawn and issued by a National Banking Association located in the State of Montana, or the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor as referenced in the Contract. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 3.3% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractor's compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60-4.3(a) and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, the Executive Order and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. 3. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs (OFCCP) within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address, and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. 4. As used in this notice and in the contract resulting from this solicitation, the "covered by any Banking Corporation incorporated under the Laws of the State of Montana, in an amount equal to not less than ten (10) percent of the total bid, payable to the order of the Gallatin Airport Authority as liquidated damages in the event said successful bidder shall fail or refuse to execute the contract in accordance with the terms of his bid. Therefore, award of the Contract by the Sponsor will be made subject to concurrence of FAA. Bidders may not withdraw Proposals for a period of Sixty (60) days after the bid opening date.

Bid Results

Transportation Terminals

$872,019.00

Public - City

Outdoor Lighting, Paving, Site Work

19

6

3

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 8, 2025

Project location map

850 Gallatin Field Rd, Belgrade, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.