BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Demolition, site work and addition to a transportation facility in Belgrade, Montana. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; and for site work for a transportation facility.

Bid date change from 10/01/2025 from 10/08/2025 as per Adda 3.Bozeman Yellowstone International Airport (BZN) East Terminal Expansion Project - Schedule 3 Project Description: Building Interiors The work consists of but is not limited to: Schedule 3 Concrete, Precast, Masonry, Stone Masonry Veneer, Structural, Miscellaneous and Decorative Steel, Railings, Carpentry, Glu Lam Construction, Finish Carpentry, Casework, Solid Surface Fabrications, Countertops, FRP, Insulation, Caulking, Flashing, Expansion Control, Doors and Hardware, Access Doors, Traffic Doors, Sliding Pass Windows, Glazing, Mirrors, Storefront, Curtain Wall, OH Doors and Grilles, Glass Railing, Metal Stud Framing, Drywall, Painting, Acoustic Ceilings, Drywall Suspension Assemblies, Wood Ceilings, Floor Coverings, Resinous Flooring, Floor and Wall Tile, Interior and Exterior Painting, Wall Covering, Signage, Toilet Compartments, Toilet and Bath Accessories, Folding Panel Partitions, Wall and Door Protection, Fire Place Specialties, Fire Extinguisher Cabinets, Lockers, Synthetic Grass, Grills and Screens, Trash Chutes, Fire Sprinkler, Plumbing, HVAC, Electrical, Communications, Access Control, Fire Alarm, Baggage Handling Systems, Cranes and Hoists The work is to include all tools, equipment, materials and labor to complete this project. Project Contacts: Please direct bids and questions to Travis Kabalin at tkabalin@martelconstruction.com , Mike Wilkinson at mwilklinson@martelconstruction.com and Tyler Ragen at tragen@martelconstruction.com Question Deadline 09/24/2025 Bidders and Sub-bidders requiring clarification or interpretation of the Bidding Documents shall make a written request which shall reach the Architect at least seven days prior to the date for receipt of Bids.

Post-Bid

Transportation Terminals

$60,000,000.00

Public - City

Addition, Demolition, Site Work

670

28

328

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
0
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2025

December 8, 2025

Project location map

850 Gallatin Field Rd, Belgrade, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.