Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 3, 2026 at 8:00 PM
Updated April 4, 2026
Site work and paving for a mixed-use development in Belgrade, Montana. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.
Phase 1: O Construct 2,900 Lf of Taxiway B and Connector Taxiways B4: Includes 43,100 Sy of P-401 Asphalt Mix Pavement, P-209 Base Course, P-152 Embankment, Excavation, Airfield Lighting, Striping, Signage, and Associated Storm Drain Installation. o Phase 2: O Construct 4,200 Lf of Taxiway B and Connector Taxiways B6: Includes 47,600 Sy of P-401 Asphalt Mix Pavement, P-209 Base Course, P-152 Embankment, Excavation, Airfield Lighting, Striping, Signage, and Associated Storm Drain Installation. This Work is to Include All Tools, Equipment, Materials, and Labor to Complete This Project. ** doc info : Payment of an additional $25.00 is required for express mail. Download delivery fee is $42.00, file size is 29 MB . ** bid date info : The bidder's name, address and state Contractor's Registration Number shall appear in the lower left-hand corner of the envelope. Bids must be sealed and delivered to the Office of the Airport Director. PN - 0761-173
Award
Transportation Terminals
$6,938,346.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
May 4, 2026
662 Wings Way, Belgrade, MT
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
