BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work for a water / sewer project in Fenton, Missouri. Completed plans call for site work for a water / sewer project.

As of March 18, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The Project is subject to the requirements of Section 292.675 RSMo, which requires all contractor or subcontractors doing work on the Project to provide, and require its on-site employees to complete, a ten (10) hour course in construction safety and health approved by the Occupational Safety and Health Administration (OSHA) or a similar program approved by the Missouri department of Labor and Industrial Relations that is at least as stringent as an approved OSHA program. The Contractor doing the work must pay for labor at rates not less than those certified pursuant to Section 290.210-.340, RSMO by the Missouri Department of Labor and Industrial Relations as indicated by the schedule included in the Contract Documents. The Contractor shall forfeit as a penalty to the District, One Hundred and 00/100 Dollars ($100.00) for each workman employed, for each calendar day, or portion thereof, such workman is paid less than the said stipulated rates for any work under said Contract by him or by any subcontractor under him (Section 290.250.). Bid security in the amount of 5 percent of the Bidder's Maximum Bid Price must accompany each Bid, as stated in the Instructions to Bidders. Document Notes : Information regarding this project can be found in the "Public Jobs" line on the Online. Contractors desiring paper copies of the contract documents may also obtain a set of such documents from Drexel Technologies: 60 Progress Parkway, Maryland Heights, MO 63043, 314-872-0900. See the Drexel Technologies website for pricing. Questions regarding the plans and specifications must be submitted, in writing, by the clarification deadline at 12:00 PM local time Tuesday, March 11, 2025 and should be directed to Mr. Chris McGauley, Project Manager at Northeast Public Sewer District's Office, Jefferson County, Mo. 636-343-5090 Ext. 228, ChrisM@northeastsewer.org. The Northeast Public Sewer District reserves the right to award the contract to the lowest and best, responsive and responsible bidder, to reject any and all bids, and to waive all informalities in the bids. No bids may be withdrawn for a period of sixty (60) days subsequent to the specified time for receipt of bids.

Bid Results

Water / Sewer

$1,394,904.00

Public - City

Site Work

13

25

11

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
129
Bidding Soon
1,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

Project location map

Winter Valley Dr, Fenton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.