Site work, paving and outdoor lighting for a mixed-use development in Kirkland, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

Question Deadline 06/19/2025 at 5:00 PM PT The NE 130th St & NE 125th St Mobility and Safety project will construct infrastructure for improved pedestrian and bike facilities and enhanced bus speed and reliability. Work includes excavation, pavement and sidewalk removal/restoration, shared asphalt paths and sidewalks, ADA curb ramps, driveways, bus stops, signing, channelization, traffic signals, lighting, landscaping, storm drainage, concrete barrier, pedestrian railing, and other project elements. For purpose of the Bidder/Subcontractor list, this project includes Electrical and Rebar work. Project Location: City of Seattle on NE 130th St from 1st Ave NE to 5th Ave NE, NE Roosevelt Way from 5th Ave NE to 10th Ave NE, and NE 125th St from 10th Ave NE to 32nd Ave NE In accordance with Chapter 39.12 RCW, the City Charter, and the Project Manual, the Contractor must pay, or cause to be paid to persons employed on or in connection with this Work, not less than the prevailing rate of wage for an hour's work specified for the labor performed. If the successful Contractor fails to complete Work within the time set forth above, (s)he will be charged Liquidated Damages per Section 4 of the Agreement and Section 1-08.9. See Section 1-08.9 for method or determining cost of liquidated damages. The Owner has the right to review Bids for material irregularities. If the Owner determines a Bid to be irregular and rejects it, notification will be sent to the Bidder in writing containing the reason for the determination QA - 6/13/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Sidewalks / Parking Lot

$12,323,350.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

143

26

59

7

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

September 2, 2025

Project location map

NE 130th Ct & NE 125th Way, Kirkland, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.