Site work and paving for a mixed-use development in Lakeville, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Bid results and tabulations may be viewed online. Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: 3500 LF Remove and Replace Concrete Curb and Gutter 4600 SF Remove and Replace Concrete Walk 41100 SY Mill Bituminous Surface 16500 SY Trail and Parking Lot Removal and Paving 600 TON Bituminous Patch Special 90 EA Adjust Frame & Ring Casting 35 EA Adjust Valve Box 250 LF 12" PVC Pipe Sewer 50 LF 15" RC Pipe Sewer 1800 LF Pavement Markings 6200 CY Excavation - Channel and Pond BIDS WILL ONLY BE ACCEPTED BY SUBMITTING AN ELECTRONIC BID. NO HARD COPY BIDS WILL BE ACCEPTED. Instructions on submitting a bid electronically can be found online. The cost to submit a bid is $25 (plus online payment vendor convenience fee). No bids will be considered unless accompanied by a certified check, or bid bond made payable to the City of Lakeville for five percent (5%) of the amount bid, to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required bond. The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the Owner. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The City of Lakeville reserves the right to reject any or all bids. Award Date: 3/17/2025 Contract Start Date: 3/18/2025 Construction Start Date: 4/7/2025 Construction End Date: 6/20/2026 The project will include bituminous surface milling, bituminous paving, concrete curb and gutter replacement, concrete sidewalk and ADA ramp replacement, storm basin maintenance, pervious paver and bituminous parking lot rehabilitations with associated striping, bituminous trail rehabilitation, and minor storm sewer installations. Question Deadline 02/25/2025 All questions about the meaning or intent of the Contract Documents are to be directed to the Engineer. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda faxed, mailed or delivered to all parties recorded by the Engineer as having received the Contract Documents. Questions received less than two (2) days prior to the date of opening of Bids may not be answered.

Award

Sidewalks / Parking Lot

$2,525,773.00

Public - City

Paving, Site Work

68

15

18

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
48
Bidding Soon
1,517
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 7, 2025

Project location map

To Be Determined, Lakeville, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.