Site work for a water / sewer project in Boonton Township, New Jersey. Completed plans call for site work for a water / sewer project.

The work of this Contract includes, but is not necessarily limited to the following: In general, the work will include furnishing of all labor, materials and equipment necessary to complete the rehabilitation of the Glenbourne Pump Station. The improvement work for the aforementioned pump station rehabilitation will include the demolition and abandonment of portions of the existing pump station and utilizing the existing 5' diameter wetwell to install new duplex submersible grinder pumps and an above-ground control station. Additional improvements include the installation of 60 LF of new 4" Ductile Iron Pipe (DIP) force main, connections to existing force main and sanitary sewer manholes, one (1) 3' diameter by-pass manhole, one (1) 4" diameter wet tap and valve, one (1) 4" diameter insertion valve, one (1) precast sanitary sewer manhole, 115 LF of 8" diameter PVC gravity sewer main, abandonment of gravity sewer and force main, flowable fill, general site restoration, by-pass pumping, and all other associated work required to complete this work as shown on that drawings and specified herein. Each Bid must be accompanied by a proposal guarantee in the form of a Bid Bond or Certified Check for an amount equal to ten percent (10%) of the full amount of each Contract Bid, not to exceed $20,000. Surety shall be made payable to: Township of Boonton, and shall be without condition or qualification. All Bidders shall be required to comply with Chapter 127, P.L. 1975, c. 127, requiring each Bidder and each Subcontractor to formulate and submit to the proper authorized representative of the State of New Jersey an Affirmative Action Program of equal opportunity which guarantees minorities employment in all categories. Bids are required to comply with the requirements of N.J.S.A. 10:5-31 et. seq. and N.J.A.C. 17:27. All bidders must comply with the Prevailing Wage Act, N.J.S.A. 34:11-56.25 et seq. and the N.J.S.A. 34:1B-5.1, Chapter 150 Laws of 1963. If the Bidder is a Corporation or a Partnership, the Bidder, in conformance with Chapter 33, P.L. 1977, shall submit with his Bid, a statement setting forth the names and addresses of all stockholders who own a 10 percent or greater interest in the firm. The Borough reserves the right to waive any informalities or to reject any and all Bids, if it is in the public interest to do so. Question Deadline 03/21/2025 No oral interpretation shall be made to any Bidder as to the meaning of any of the Contract Documents or be effective to modify any of the provisions of the Contract Documents. All questions shall be submitted in writing to the Engineer and shall be postmarked at least ten (10) calendar days before the established date for Bid opening. The Engineer will arrange an addenda, which shall become part of the contract, all pertinent questions received and his decision regarding each. Prior to the opening of the Bids, a copy of these addenda will be sent to each of those who have obtained a set of the Contract Documents from the Engineer.

Bid Results

Water / Sewer

$512,000.00

Public - City

Site Work

18

27

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fastenings, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
486
Active Projects
291
Bidding Soon
5,292
All Active Projects
2,154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

img_map_placeholder

Glenbourne Dr, Boonton Township, NJ

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Glenbourne Pump Station Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.