Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Aberdeen, Washington. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
This steel swing span bridge was built with untreated timber piles. The bridge sags during operation. By replacing the entire grid bridge deck will improve the bridge operation. Length : 0.050 Begin Termini : 0.08 End Termini : 0.13 As of October 1 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - US 12/Heron St Bridge - Grid Deck Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Bridges / Tunnels
$1,846,320.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
US-12 & E Heron St, Aberdeen, WA
Related To This Project
Aberdeen, WA
--
Aberdeen, WA
Bid Date: Mar 21 2025
Aberdeen, WA
Bid Date: Mar 19 2025
Aberdeen, WA
Bid Date: Mar 25 2025
Aberdeen, WA
Bid Date: Mar 18 2025
Aberdeen, WA
Bid Date: Apr 15 2025
Aberdeen, WA
--
Aberdeen, WA
Bid Date: May 01 2025
Aberdeen, WA
Bid Date: Feb 19 2025
Aberdeen, WA
Bid Date: Dec 16 2025
Aberdeen, WA
Bid Date: Feb 04 2025
Aberdeen, WA
Bid Date: Feb 05 2025
Aberdeen, WA
--
Aberdeen, WA
Bid Date: Jan 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
