Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 24, 2025 at 8:00 PM
Updated April 9, 2025
Site work and paving for a mixed-use development in Iowa City, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Currier Residence Hall - Repair Concrete and Sidewalks Around Multiple Building Locations Shive-Hattery, Inc. Attn: Evan Walsh, PE 2839 Northgate Drive Iowa City, Iowa 52245 (319) 248-3391 ewalsh@shive-hattery.com Targeted Small Business (TSB): The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid. This establishes the amount that should be reported on the Final Payment Reporting Form as part of the TSB Program General Description of Work: 1) Project consists of installing and maintaining site fencing and traffic control, surface demolitions, concrete sidewalk, loading dock pavement, and select structural repairs. Restore additional disturbed areas with topsoil and sod. 2) Alternates: None 3) Allowances: None 4) Unit Prices: None e. Work by Owner: 1) Mechanical piping modifications in Currier Hall basement to allow Constructor to repair basement wall. 2) Heat sensor disconnection for interior work in Currier Hall basement. Work Sequence: 1) Phase 1 work includes site improvements at Burge, Hillcrest, Parklawn, Petersen, Rienow, and Slater Halls. Constructor may begin Phase 1 work on 5/19/25 and be substantially complete with Phase 1 work by 7/25/25. Final Completion by 8/1/25. a. Hillcrest Hall loading dock construction activities may begin 5/26/25. Constructor to be substantially complete and have loading dock open for deliveries by 6/27/25. b. Slater Hall loading dock construction activities may begin 5/26/25. Constructor to be substantially complete and have loading dock open for deliveries by 7/11/25. 2) Phase 2 work includes site improvements at Currier, Stanley, Catlett, and Daum Halls. Constructor may begin Phase 2 work on 5/18/26 and be substantially complete with Phase 2 work by 7/24/26. Final Completion by 7/31/26.
Award
Sidewalks / Parking Lot
$570,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
May 19, 2025
100 Currier Hall, Iowa City, IA
Related To This Project
Iowa City, IA
Bid Date: Mar 11 2025
Iowa City, IA
Bid Date: Mar 11 2025
Iowa City, IA
Bid Date: Mar 28 2025
Iowa City, IA
Bid Date: Mar 13 2025
Iowa City, IA
Bid Date: Mar 06 2025
Iowa City, IA
Bid Date: Mar 28 2025
Iowa City, IA
Bid Date: Apr 09 2025
Iowa City, IA
Bid Date: Mar 25 2025
Iowa City, IA
Bid Date: Mar 18 2025
Iowa City, IA
Bid Date: Mar 11 2025
Iowa City, IA
Bid Date: Mar 11 2025
Iowa City, IA
Bid Date: Apr 01 2025
Iowa City, IA
Bid Date: Feb 25 2025
Iowa City, IA
Bid Date: Feb 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
