BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 24, 2025 at 8:00 PM

Updated April 9, 2025

Site work and paving for a mixed-use development in Iowa City, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Currier Residence Hall - Repair Concrete and Sidewalks Around Multiple Building Locations Shive-Hattery, Inc. Attn: Evan Walsh, PE 2839 Northgate Drive Iowa City, Iowa 52245 (319) 248-3391 ewalsh@shive-hattery.com Targeted Small Business (TSB): The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid. This establishes the amount that should be reported on the Final Payment Reporting Form as part of the TSB Program General Description of Work: 1) Project consists of installing and maintaining site fencing and traffic control, surface demolitions, concrete sidewalk, loading dock pavement, and select structural repairs. Restore additional disturbed areas with topsoil and sod. 2) Alternates: None 3) Allowances: None 4) Unit Prices: None e. Work by Owner: 1) Mechanical piping modifications in Currier Hall basement to allow Constructor to repair basement wall. 2) Heat sensor disconnection for interior work in Currier Hall basement. Work Sequence: 1) Phase 1 work includes site improvements at Burge, Hillcrest, Parklawn, Petersen, Rienow, and Slater Halls. Constructor may begin Phase 1 work on 5/19/25 and be substantially complete with Phase 1 work by 7/25/25. Final Completion by 8/1/25. a. Hillcrest Hall loading dock construction activities may begin 5/26/25. Constructor to be substantially complete and have loading dock open for deliveries by 6/27/25. b. Slater Hall loading dock construction activities may begin 5/26/25. Constructor to be substantially complete and have loading dock open for deliveries by 7/11/25. 2) Phase 2 work includes site improvements at Currier, Stanley, Catlett, and Daum Halls. Constructor may begin Phase 2 work on 5/18/26 and be substantially complete with Phase 2 work by 7/24/26. Final Completion by 7/31/26.

Award

Sidewalks / Parking Lot

$570,000.00

Public - State/Provincial

Paving, Site Work

23

14

10

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
1,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 19, 2025

Project location map

100 Currier Hall, Iowa City, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.