BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2025 at 7:00 PM

Updated February 20, 2025

Site work and paving for a sidewalk / parking lot in Worden, Illinois. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Village of Worden, Illinois, has received a Federal Grant for the purpose of making sidewalk improvements throughout the Village. The funds will be used for Preliminary Engineering, Construction and Construction Engineering. The Village is soliciting proposals from interested Consulting Engineers qualified to complete the Preliminary Engineering and Construction Engineering Services for the following described project: 1. At locations within the Village where sidewalks are important for pedestrian use and where the existing sidewalks are deteriorated, the project will replace those sections of sidewalk. The extent of this work will be limited by the budget for the project. 2. The project will be administered through the Illinois Department of Transportation in accordance with the Safe Routes to Schools Program. The project will involve development of a Project Report, approved by FHWA; preparation of detailed Plans, Specification and Bidding Documents in accordance with the Illinois Standard Specification for Road and Bridge Construction (latest edition), also approved by FHWA; and construction of the project under the direction of a Resident Engineer. All Federal and State procedures must be followed for acquisition of right- of-way/easements, including Environmental Clearance as required. The deadline for having these funds obligated is September 30, 2026. The above steps must be completed by this date. Securing FHWA approval, obtaining Environmental Clearances, preparing for and attending meetings established by others and other items outside the control ofthe Village or Consultant may create problems in reaching the above deadline. The total budget for the project is $408,250.00. If you would like to submit your qualifications for consideration to execute these Preliminary Engineering and Construction Engineering services, please contact the Village Clerk at clerk@worden-il.com and request the Quality Based Selection (QBS) Policy and Procedures adopted by the Village. The method of Contractor Selection has not been Determined at this time.

Conceptual

Sidewalks / Parking Lot

$408,250.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
93
Bidding Soon
1,381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

Project location map

Multiple Locations, Worden, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.