BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work, paving and renovation of a mixed-use development in Houston, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the renovation of a water / sewer project; and water / sewer project.

Lift Station No. 5 Flood Mitigation Improvements 6. Questions cut-off date is now Monday, March 3rd, 2025, at 5:00 PM. In general, this work consists of: Temporary bypass pumping for lift station rehabilitation to provide continuous sewer service during rehabilitation. Demolition of existing piping, valves, vents, motors, blowers, drains, stairs, railings, and all other related items as shown on the plans. Remove existing pumps (3) and replace with Sulzer XFP150E CB1 Submersible Pumps (3) or engineer approved substitute, including pump stands and pump pads. Demolition of existing electrical system, including demolition of MCC, lighting and receptacles, pump motor feeders and terminal boxes, pump control floats and transducer, electrical service equipment, autosensory controls, telephone service, removal of pole and relocation of SCADA antenna. Miscellaneous lift station site improvements including, installation of metal handrails on the concrete electrical platform, installation of a concrete pad, and removal and replacement of wet well and valve vault access hatches with access hatches that include metal safety grates, including all associated appurtenances, as shown on the plans. Installation of galvanized steel platform, including foundation, platform, stairs, handrails, and all required appurtenances. Installation of 316 stainless steel riser piping and discharge piping with pipe supports. Installing a portion new 12-inch AWWA C-900 green force main with pipe supports. Wet connections to existing 8-inch sanitary sewer force mains. Surface preparation of wet well interior and valve vault interior for the application of cementitious liner, including cleaning, removal and disposal of sediment, grit, sludge, existing epoxy or protective coating lining, and unsound concrete. Repair wet well interior with a cementitious material for extremely harsh environments to a minimum thickness of 1-inch, and reline wet well interior with an engineer approved epoxy coating including surface preparation. Install electric overhead monorail crane for pumps. Install a new crushed concrete access drive for the lift station per the plans with geogrid. Site restoration of disturbed areas, including replacing existing concrete, sidewalks, turf, shrubs, fences, and trees, including trimming trees as required. Electrical system installation, including automatic transfer switch, low voltage panel, site lighting, receptacles, ductbank, conductors, conduits, and all appurtenances for a complete and functional system as described in plans and specifications. Installation of on-site natural gas generator including sound attenuating enclosure, generator pad, and all required equipment for a fully functional emergency generator system.

Bid Results

Water / Sewer

$1,711,777.00

Public - City

Paving, Renovation, Site Work

31

18

11

6

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
338
Active Projects
60
Bidding Soon
3,633
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 10, 2025

Project location map

Brook Forest Dr, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.