BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2025 at 8:00 PM

Updated April 19, 2025

Renovation of a mixed-use development in Springfield, Ohio. Completed plans call for the renovation of a educational facility.

The Springfield City School District Board of Education is accepting proposals to replace the gym floor in the Districts main high school gymnasium. Interested companies may request an RFP from Mike Dellapina, at dellapinamr@scsdoh.org The scope of work for this project includes, but is not limited to: Removal and Disposal of the existing gym floor, including any underlayment, adhesives, or debris. Preparation of the Subfloor to ensure it is level, clean, and free of any contaminants. Installation of New Flooring, please price both a grade 1 and 2 maple floor including all materials (e.g., wood, synthetic, or resilient flooring options), finishes, and markings for gym activities (basketball, volleyball, etc.). Surface Finishing, including sanding, sealing, and painting as necessary. Flooring Materials: The new floor must be durable, safe, and compliant with industry standards for high school athletic floors. Preference will be given to sustainable, environmentally friendly materials. Warranty: The contractor must provide a minimum 1 - year warranty that covers Defects in workmanship, such as improper installation, poor finishes, or structural issues arising from the work performed. A representative will assess the problem and work with the district to resolve it promptly. Should the claim be valid under the terms of this warranty, we will repair or replace the work at no cost to you.A response from the contractor will be within the first 24 hours for all repair calls. Timeline: The project must be completed by July 2025 A pre-proposal site visit is scheduled for February 27, 2025 at 2:00 PM. Interested contractors are encouraged to attend to review the existing gym floor and assess the scope of work in person. Please RSVP to Mike Dellapina at dellapinamr@scsdoh.org or (937) 505-4317 by February 26, 2025. For any questions or clarification regarding the RFP, please contact: Mike Delapina Springfield City School District Athletic Director dellapinamr@scsdoh.org 937-505-4317

Award

Educational

$41,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
161
Bidding Soon
2,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

Project location map

To Be Determined, Springfield, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.