Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated August 21, 2025
Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.
The project location in the County of Santa Cruz is as follows: Unincorporated Santa Cruz County within Arana Gulch at two sites, one adjacent to Harbor High School and the other adjacent to Brookwood Drive. Work includes habitat restoration including site preparation, temporary irrigation system installation, planting, and 5 years post-installation maintenance at two locations within Arana Gulch to mitigate for plants previously removed as part of a sewer rehabilitation project. Complete the habitat restoration including site preparation, temporary irrigation system installation and planting within 90 working days. Complete 5 years of post-installation maintenance. The estimated cost of the project is $249,400. Question Submission Deadline:May 8, 2025, 2:00pm Question Response Deadline:May 12, 2025, 5:00pm The Arana Trunkline Replacement project replaced 1,688 linear feet of sewer main and is scheduled for completion in June of 2025. The Arana Gulch Sewer Replacement, Phase 1 Habitat Restoration requires habitat restoration work following the construction to include: amending the soil as necessary, removing invasive weeds that could complete with native plants, installing a temporary irrigation system to ensure the newly planted native species receive adequate water during their establishment phase, installing native planting, and planting native seeds. To ensure the success of the habitat restoration project, the scope of work includes five years of post-installation maintenance, which involves tasks such as monitoring the health of the plants, removing invasive species, and managing the irrigation system until the plants are fully established. Container plants have been pre-purchased by the District for use in this project and are therefore not included in the bid item list.
Award
Water / Sewer
$227,016.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 16, 2025
Multiple Locations, Santa Cruz, CA
Related To This Project
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Apr 04 2025
Santa Cruz, CA
Bid Date: Mar 06 2025
Santa Cruz, CA
Bid Date: Mar 12 2025
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Mar 11 2025
Santa Cruz, CA
Bid Date: Mar 18 2025
Santa Cruz, CA
Bid Date: Apr 01 2025
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Mar 03 2025
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Mar 12 2025
Santa Cruz, CA
Bid Date: Feb 18 2025
Santa Cruz, CA
Bid Date: Feb 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.