BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Renovation of a conference / convention center in Topeka, Kansas. Working plans call for the renovation of a conference / convention center.

**As of April 15, 2025 bids for this project has been rejected. As of this time it is unknown if and when project will rebid. Replacement of Water Softener and Water Heater Shawnee County is soliciting sealed bids for replacement of water softener and tankless water heater at Maner Conference Center kitchen. Pricing shall be for complete working installation and 1 year warrantee. Water Softener: 1. Isolate, drain and remove existing water softener, properly disposing of. 2. Provide and install new North Star PA1015S or prior approved equal commercial water softener. Water softener will need to be installed with the ability to add a duplex softener if the demand increases in the future. 3. Connect existing water lines making modifications as needed. 4. Reconnect to existing electrical making modifications as needed. 5. The price is to include all materials, parts, labor standard shipping, hoisting, electrical and complete system start-up as recommended by manufacturer. 6. All work to be performed during normal business hours. 7. Project is Sales Tax exempt. 8. Any additional services beyond this scope will be based on time and materials upon owner approval to proceed. Tankless Water Heater: 1. Isolate and drain existing water heater. 2. Disconnect water, gas and vent piping from existing 80 gal, tank style water heater. Remove and properly dispose, cap vent stack. 3. Provide and install two (2) new Navien 199,000 BTU tankless condensing, gas water heaters or prior approved equal commercial water heaters. Additionally, heaters are equipped with an internal recirculation pump and buffer tank. These new heaters will be relocated north of the existing tank location. 4. Service valve kits for both heaters to allow for de-scaling maintenance. 5. Provide material to install PVC intake and exhaust piping. Terminate on the roof. 6. Connect to existing water and gas lines making changes as needed for relocation. 7. The price is to include all materials, parts, labor standard shipping, hoisting, electrical and complete system start-up as recommended by manufacturer. 8. All work to be performed during normal business hours. 9. Project is Sales Tax exempt. 10. Any additional services beyond this scope will be based on time and materials upon owner approval to proceed. All questions regarding this bid should be posted on the online Electronic Bid System.

Final Planning

Conference / Convention Centers

$34,230.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
86
Bidding Soon
1,126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

October 15, 2025

Project location map

1717 SW Topeka Blvd, Topeka, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.