BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 4, 2025 at 8:00 PM

Updated October 5, 2025

Site work, paving and outdoor lighting for a mixed-use development in Toppenish, Washington. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; road / highway; and for outdoor lighting for a road / highway.

Reconstruct Jackson Street from Juniper Street west approximately 1,000 feet, then extend Jackson Street west approximately 2,000 feet to Ward Road. Construct the extended section with three lane (minimum) hot mix asphalt, curb and gutter, sidewalks, storm drainage, and street lighting. County: Yakima Agency: Toppenish Total Project Length : 0.550 Begin Termini : Juniper Street End Termini : Ward Road As of October 4 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - Jackson Street Extension *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$1,972,616.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
27
Bidding Soon
400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2026

Project location map

Jackson St, Toppenish, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.