Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 4, 2025 at 8:00 PM
Updated October 5, 2025
Site work, paving and outdoor lighting for a mixed-use development in Toppenish, Washington. Working plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; road / highway; and for outdoor lighting for a road / highway.
Reconstruct Jackson Street from Juniper Street west approximately 1,000 feet, then extend Jackson Street west approximately 2,000 feet to Ward Road. Construct the extended section with three lane (minimum) hot mix asphalt, curb and gutter, sidewalks, storm drainage, and street lighting. County: Yakima Agency: Toppenish Total Project Length : 0.550 Begin Termini : Juniper Street End Termini : Ward Road As of October 4 , 2025, the project is in Conceptual status. Anticipated letting Year is 2026. WADOT - Jackson Street Extension *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$1,972,616.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 2, 2026
Jackson St, Toppenish, WA
Related To This Project
Toppenish, WA
Bid Date: Apr 10 2025
Toppenish, WA
Bid Date: Apr 18 2025
Toppenish, WA
Bid Date: May 19 2025
Toppenish, WA
Bid Date: Aug 14 2025
Toppenish, WA
Bid Date: Aug 22 2025
Toppenish, WA
Bid Date: Aug 28 2025
Toppenish, WA
Bid Date: Feb 27 2025
Toppenish, WA
Bid Date: Feb 11 2025
Toppenish, WA
Bid Date: Feb 27 2025
Toppenish, WA
--
Toppenish, WA
Bid Date: Dec 13 2024
Toppenish, WA
Bid Date: Dec 04 2024
Toppenish, WA
Bid Date: Nov 06 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
