BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work and new construction of a mixed-use development in Derry, Pennsylvania. Completed plans call for the construction of a playground / park / athletic field; playground / park / athletic field; for site work for a sidewalk / parking lot; and water / sewer project.

Electrical Construction This project includes construction of a new Park Office with primary functions of visitor contact and park administration. The office will replace the existing modular park office which is energy inefficient, undersized, and has mold issues. The project consists of full site development, park office, vehicle parking and traffic flow, signage, utilities, and landscaping. 02/10/2025 04:30 PM EST All questions must be received through the electronic Service. Per the Instructions/Bid Information the contractor will have Three Hundred Sixty-Five (365) days to complete the work the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of One Thousand Dollars ($1,000.00) per day for each and every calendar day thereafter until the work shall be completed and accepted. SDB Participation Goal 8% VBE Participation Goal 3% Engineers Estimate: $500,000 - $1M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Allows zero unit prices and labor Yes Allows negative unit prices and labor Yes 4. Work performed under the contract shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment, miscellaneous items and performing all work necessary to complete all construction to the satisfaction of, and subject to the approval of, the Department. 5. All construction work shown on the contract drawings and not expressly mentioned in the specifications, and all work specified and not shown on the contract drawings but obviously necessary for the proper execution of same shall be performed by the Contractor. It is expressly intended that the work of this contract shall provide a complete and fully functional and accessible structure, finished in every aspect and detail as would be considered industry standard, as it is not the intent to delineate or describe every detail and feature of the work. No additions to the contract sum will be approved for any materials, equipment and/or labor to perform work hereunder unless it can be clearly shown to be beyond the scope and intent of the drawings and specifications, and absolutely essential to the proper execution of the work.

Bid Results

Playgrounds / Parks / Athletic Fields

$942,000.00

Public - State/Provincial

New Construction, Site Work

71

31

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
322
Active Projects
188
Bidding Soon
1,416
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 21, 2025

Project location map

1150 Keystone Park Rd, Derry, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.