BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work and paving for a road / highway in Derry, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Stable Lodge Road Paving Keystone State Park Derry Township, Westmoreland County, Pennsylvania Work included under this contract consists of reconstruction of existing roadways on Stable Lodge Rd. in the Keystone State Park campground. The work includes 3,940 SY milling asphalt pavement, 870 TON 2A stone, 1,200 TON Superpave base course, 1,400 TON Superpave wearing course, 225 LF 24" polymer coated CMP, 1 Type M Inlet, rip rap aprons and erosion and sediment controls. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000 Q & A Deadline 04/07/2025 04:30 PM EDT Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within One Hundred Fifty (150) calendar days. Bond Percentage 10.00% *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. a. Reconstructed Roadway (Contact Station to Hillside Dr. & Dam to Loop Area) - Placement of 3" 2A stone (Dam to Loop Area), milling 5" depth (in-place), grade and compact milled subbase followed by placement of 3" of 25mm base course and 1.5" of 9.5mm wearing on existing roadways as shown on the plans. b. Overlay Areas: 1) Overlay of existing asphalt roadways with 1" depth fine grade wearing (leveling) course. 2) Overlay of existing asphalt roadways with 1.5" depth 9.5mm wearing course. c. Construction of 24" polymer coated CMP storm pipe, Type M inlet. Demolition of the existing storm pipe and inlet are incidental to this work. d. Rip rap aprons and ditch cleaning. The cleaning of the existing ditch downstream of the rip rap apron shall be incidental to the construction of the rip rap apron. e. Adjustment of utilities rims, boxes or grates. f. Erosion and Sedimentation Pollution Controls including seeding and restoration of all disturbed areas.

Award

Roads / Highways

$342,725.00

Public - State/Provincial

Paving, Site Work

8

8

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
122
Bidding Soon
1,282
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

1150 Keystone Park Rd, Derry, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.