Renovation of an educational facility in Edgewater Park, New Jersey. Completed plans call for the renovation of a 23,400-square-foot educational facility.

The project consists of, but is not limited to, the complete tear-off of the existing SBS roofing system (approximately 23,400 sf) and replacement with the proposed SBS roofing system at the Samuel M. Ridgway School. Question Deadline 02/28/2025 at 1:00 PM ET Registered Bidders must submit substitution requests or any questions concerning the project to the Architect on Form 006001 BIDDER REQUEST FOR INFORMATION included in the Project Manual The Architect will not respond to questions received by those other than registered Bidders. Inquiries shall be directed to: Regan Young AIA REGAN YOUNG ENGLAND BUTERA, PC 456 High Street Mt. Holly, NJ 08060 (609) 265-2652/0333 Fax rgy@ryebread.com. Bidders must be pre-qualified by the New Jersey Department of the Treasury, Department of Property and Management Construction, prior to the date that bids are received. Any bids submitted under the terms of New Jersey Statutes not including a copy of a valid and active Pre qualified/Classification Certificate and New Jersey Department of Labor Contractor Registration Certificate may be rejected as being non-responsive to bid requirements. Bids must be made upon Specification Section 002000, FORM OF BID and shall include a certified check, cashier's check, or by Bid Bond drawn to the order of the EDGEWATER PARK BOARD OF EDUCATION in the amount of ten percent (10%) of the Base Bid but in no case in excess of $20,000.00. The bid shall also be accompanied by an executed Consent of Surety in accordance with N.J.S.A. 18A:18A-25, agreeing to furnish a Performance Bond and a Payment Bond, each in the stated principal amount of one hundred percent (100%) of the contract amount, and a two-year Maintenance Bond in the amount of ten percent (100%) of the contract amount. Registered Bidders must submit substitution requests or any questions concerning the project to the Architect on Form 006001 BIDDER REQUEST FOR INFORMATION included in the Project Manual no later than 1:00 PM Friday, 28 February 2025. The Architect will not respond to questions received by those other than registered Bidders. Inquiries shall be directed to: Regan Young AIA REGAN YOUNG ENGLAND BUTERA, PC 456 High Street Mt. Holly, NJ 08060 (609) 265-2652/0333 Fax rgy@ryebread.com. The EDGEWATER PARK BOARD OF EDUCATION has the right to award the contracts within sixty (60) days of the bid opening and reserves the right to reject all bids in accordance with N.J.S.A. 18A:18A-22 and to waive minor informalities or non-material exceptions, as may be permitted by law.

Post-Bid

Educational

$1,360,000.00

Public - City

Renovation

9

12

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal and Moisture Protection, Preparation for Re-Roofing, Dampproofing and Waterproofing, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Carpeting, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork Methods, Soil Stabilization, Shotcrete Soil Slope Stabilization
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
293
Bidding Soon
4,615
All Active Projects
2,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

June 18, 2025

img_map_placeholder

300 Delanco Rd, Edgewater Park, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Partial Reroof (Renovation) Samuel M. Ridgway Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.